This example represents a 54 hour accumulation of a field produced by a re-forecast started on 20120101 00Z produced with the model version which is operational at 20130101 00Z .
- In bold, the values are fixed. They are meant to be used by all partners
- In green, these are the values for the example.
| Time ( accumulated ) | ||||
| Start of re-forecast ( section 1 ) | ||||
Octets | Values | Meaning of values | Grib_api keys | |
|---|---|---|---|---|
| 12 | Significance of Reference Time | 1 |
dataDate=20120101 dataTime=0 | |
| 13-14 | Year (four digits) | 2012 | year of start of forecast | |
| 15 | Month | 01 | month of start of forecast | |
| 16 | Day | 01 | day of start of forecast | |
| 17 | Hour | 00 | hour of start of forecast | |
| Accumulation ( section 4 e.g. template 4.61 ) | ||||
| 18 | Indicator of unit of time range | 1 | Hour | |
| 19-22 | Forecast time | 0 | Accumulation starts at step=0 | startStep=0 |
| 38-39 | Year of Model Version | 2013 |
When the forecast is run == when the version of the forecast used was operational | modelVersionDate=20130101 modelVersionTime=0 |
| 40 | Month of Model Version | 01 | ||
| 41 | Day of Model Version | 01 | ||
| 42 | Hour of Model Version | 00 | ||
| 43 | Minute of Model Version | 00 | ||
| 44 | Second of Model Version | 00 | ||
| 45-46 | year of end of overall time interval | 2012 |
End of accumulated period, 20120103 06Z | |
| 47 | month of end of overall time interval | 01 | ||
| 48 | day of end of overall time interval | 03 | ||
| 49 | hour of end of overall time interval | 06 | ||
| 52 | number of time ranges | 1 | Only one type of time statistics used (accumulation) | |
| 53-56 | total number of data values missing in statistical process | 0 | ||
| 57 | Statistical process used to calculate the processed field from the field at each time increment during the time range | 1 | Accumulation | stepType=accum |
| 58 | Type of time increment between successive fields used in the statistical processing | 2 | Successive times processed have same start time of forecast, forecast time is incremented | |
| 59 | Indicator of unit of time for time range over which statistical processing is done | 1 | Hour | |
| 60-63 | Length of the time range over which statistical processing is done, in units defined by the previous octet | 54 | Time step (in hour) at the end of the accumulation from start of forecast | endStep=54 |
| 64 | Indicator of unit of time for the increment between the successive fields used | 255 | Missing | |
| 65-68 | Time increment between successive fields, in units defined by the previous octet | 0 | 0 | |
Examples of grib2 headers: