Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Control and perturbed forecasts are identified in section 1 and 4. The following tables explains how to code them in GRIB2:

Section 1
Octets
Example perturbedExample control
21typeOfProcessedData=4 =3 


Ensemble (section 4, template 4.61)
Octets
Example perturbedExample control
35type of ensemble forecast= 255 (missing) = 255 (missing) 
36perturbation number= 7= 0
37number of forecasts in ensemble= 51= 51

3) Time component and reforecasts 

4) Examples of GRIB2 files


real-timere-forecast
Daily average  Control  PerturbedControl Perturbed
Accumulations  Control  PerturbedControl  Perturbed
Instantaneous  Control  PerturbedControl Perturbed
Maximum over the last 6 hours  Control  PerturbedControl Perturbed
Minimum over the last 6 hours  Control Perturbed

Example of a new ocean parameter 


real-timere-forecast
Daily average  Control  PerturbedControl Perturbed