Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Image Added

The Flood Summary layers show where GloFAS forecasts a flood within 3 distinct time periods: days 1-3, days 4-10, and days 11-30. For GloFAS model river network with upstream area larger than 1000km2, the layer has different colour depending on the forecast value during the forecast period:

  • Purple: maximum of the ensemble mean discharge is >20 year (purple)
  • Red: maximum of the ensemble mean discharge is between 5-20 year
  • Dark yellow: maximum of the ensemble mean discharge is between 2-5 year
  • Light yellow: total probability >20% exceeds 2-year

Image Modified