Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The meteorological forcing data are all the information necessary to produce hydrological simulations.

  • (proxy)Historical hydro- meteorological time series records: they are used to calibrate the hydrological model, and to define the flood thresholds used to derive most CEMS-Flood products. They For EFAS, they are collected from national agencies and other relevant stakeholders, quality checked and managed by the CEMS Meteorological and Hydrological Data Collection Centres Centre (MDCC and HDCC respectively). For GloFAS, or they are taken from the Copernicus Climate Change ERA5 reanalysis (for GloFAS).
  • Real-time hydro- meteorological observations: they are necessary to define the starting points of the hydrological forecasts, also called initial conditions. They   For EFAS, they are collected from national agencies and other relevant stakeholders, quality checked and managed by the CEMS Meteorological and Hydrological Data Collection Centres Centre (MDCC and HDCC respectively) before being transferred to the CEMS Computation Centre (COMP).). For GloFAS, they are taken from the Copernicus Climate Change ERA5 reanalysis. GloFAS uses the unconsolidated C3S ERA5-T reanalysis a proxy meteorological observation until it is available, and the first day of the control member of the ECMWF-ENS forecast
  • Meteorological forecasts: they are used to provide the future meteorological input to the hydrological models. Both deterministic (i.e single realisation from a single numerical weather prediction system) and ensemble (i.e. multiple realisations -also called ensemble members - from a single numerical weather prediction NWP system) forecasts are used in CEMS-Flood, obtained from a range of providers. Different NWPs are used in EFAS and GloFAS, described in each service page. 

The land surface data are all the information necessary to set-up and implement the hydrological models.

  • Land surface data: they include land surface information and calibrated model parameters used drive the hydrological model LISFLOOD. They are prepared in advance by COMP, with contribution from the JRC.

Some of CEMS-Flood meteorological forcing and land surface data are provided as layers in the EFAS-IS and GloFAS-IS mapviewer. An overview is provided in their dedicated page. (to edit → we have now 2 pages?)