Selection of stations
GloFAS v5 verification activities are based on the river| Info |
|---|
The following page describes changes relating to the he latest pre-operational release of GloFAS (v5.0), made available on GloFAS Stage Platform from 12 November 2026 00z (UTC). For more information see: https://confluence.ecmwf.int/x/38QHIQ |
Purpose of this page
This page describes how the hydrological performance of GloFAS is verified, from GloFAS v5 onwards. The method is used both for the GloFAS hydrological model performance assessment and for the hydrological model performance layer in the GloFAS map viewer.
From GloFAS v5, the performance is evaluated for the first time on the GloFAS historical river discharge reanalysis (the long-term run), at all the river gauging stations used in the
GloFAS v5model calibration. Parts of the method therefore differ from earlier GloFAS versions. The main differences are listed in the section "Differences from previous GloFAS versions". The method used for GloFAS v4 is described on the page [GloFAS hydrological performance verification methodology (GloFAS v4)].
Selection of stations
The verification uses the river gauging stations from the GloFAS model calibration, which
wasis carried out by the Joint Research Centre (JRC) of the European Commission (see GloFAS v5 calibration methodology and parameters)
. The verification is based on 5,378 calibration stations, located in 119 countries. Each station
is locatedlies on the GloFAS
v5river network and has daily river discharge observations available to the GloFAS team. For GloFAS v5, these are 5,378 stations in 119 countries (there was one extra station for calibration that was assigned as duplicate based on updated observational metadata). The same set of stations is used for the
GloFAS v5hydrological model performance assessment and for the hydrological model performance layer in the map viewer
:.
- Length of observation record:
- The verification applies no record-length criterion of its own. The record length is already controlled by the calibration station selection, which requires at least 4 equivalent years of daily observations (365 × 4 days with data) within 1980–2023 (see GloFAS v5 calibration data). A few stations with shorter records were kept in the calibration, as exceptions, to improve the spatial coverage in data-scarce areas. In the verification, every station is assessed over all days on which observations and the reanalysis are both available, so a station's record can differ from the one used in the calibration. Scores at stations with short records are less robust and should be interpreted with care.
- Lake, reservoir and human influence:
- The verification does not exclude any stations because of lake, reservoir or other human influence. Unlike earlier GloFAS versions, there are no separate station sets without such influence. The calibration station selection already excluded stations that are highly affected by reservoir operations or by processes the model does not represent, such as river diversions (see GloFAS v5 calibration data). The remaining stations can still be influenced by lakes, reservoirs or human activity. These catchments are harder to model, so their scores should be interpreted with care.
Verification period and reference simulation
The verification is carried out on the GloFAS historical river discharge reanalysis, which is the long-term simulation of the GloFAS hydrological model forced with meteorological reanalysis. For GloFAS v5, the reanalysis runs from January 1979 to December 2025 and can be accessed via EWDS.
The whole reanalysis period is verified against all available river discharge observations. There is no separate verification period.
Verification period
The GloFAS v5 hydrological model performance assessment and the evaluation layer in the map viewer are based on the GloFAS v5 historical river discharge reanalysis, available from January 1979 to December 2025. The data can be accessed via EWDS https://ewds.climate.copernicus.eu/datasets/cems-glofas-historical?tab=download.
The verification uses the whole reanalysis period with all available river discharge observations, from 1 January 1979 at the earliest to 31 December 2025 at the latest. Both the general performance analysis and the GloFAS hydrological model performance layer in the map viewer (placeholder - GloFAS hydrological model performance web product) used this period. The observations are the most recent ones available in the GloFAS hydrological observation database at the time of the verification (autumn 2026).For each station, the scores are computed over all days on which both the reanalysis and the observations are available
. Gaps, and gaps in the observations are not filled.
There is no separate verification periodThe observations are the most recent ones in the GloFAS hydrological observation database at the time of the verification. The model spin-up years
covered an earlier period, from 1975 until the end of 1978, andbefore the start of the reanalysis are not part of the verification.
The reanalysis is the simulation from which the GloFAS flood thresholds (return periods) are derived. The verification therefore shows how well the simulation that underpins the forecast flood thresholds reproduces the observed river discharge.
The verification scores differ from those reported for the model calibration (see GloFAS v5 calibration hydrological model performance)
, as the verifications period differ, and also the final verification used a more updated record of observational data. The calibration and the verification cover different periods, and the verification uses a more recent observation record. Moreover, at some stations, reservoirs upstream were built during the period covered by the observations. In the calibration, these reservoirs were switched off where the observations used describe the natural flow regime before construction. In the reanalysis, all reservoirs are switched on, so that it represents present-day regulated conditions for the flood thresholds. At these stations the reanalysis is partly compared with a flow regime that no longer exists, and its scores can be lower than in the calibration. This is expected and does not mean the reanalysis or the flood thresholds are less reliable for present-day conditions. These stations, their scores and an interactive map are described on [GloFAS v5 stations with reservoirs built during the observation record].
Performance scores
GloFAS hydrological performance verification is done against the river discharge observations available to the GloFAS team. The hydrological model performance analysis is based on the modified Kling–Gupta efficiency (KGE′; Gupta et al., 2009; Kling et al., 2012; ideal value is 1):
| Mathinline |
|---|
KGE' = 1 - \sqrt{(r - 1)^2 + (\beta - 1)^2 + (\gamma - 1)^2}, \qquad
\beta = \frac{\mu_s}{\mu_o}, \qquad
\gamma = \frac{\sigma_s / \mu_s}{\sigma_o / \mu_o} |
where s and o are the simulated and observed river discharge, μ is the mean and σ the standard deviation.
The three components of KGE′ are also shown:
- Pearson correlation (r) highlights timing errors through the strength of the linear relationship between the simulated and observed time series. It ranges from −1 to 1, with 1 as the ideal value.
- Bias ratio (β) represents the volume errors, as the ratio of the mean simulated to the mean observed discharge. It ranges from 0 to +∞, with 1 as the ideal value. Values above 1 mean the simulated volume is too large, values below 1 that it is too small.
- Variability ratio (γ) shows the errors in the variability of the flow, as the ratio of the coefficients of variation of the simulated and observed discharge. Using the coefficient of variation makes it independent of the bias. It ranges from 0 to +∞, with 1 as the ideal value.
In addition, three further scores are used in GloFAS v5:
- Nash–Sutcliffe efficiency (NSE; Nash and Sutcliffe, 1970) measures how much better the simulation is than simply using the mean observed discharge. It ranges from −∞ to 1, with 1 as the ideal value; 0 means the simulation is no better than the observed mean. It is very sensitive to errors in high flows.
| Mathinline |
|---|
NSE = 1 - \frac{\sum_{i=1}^{n}(s_i-o_i)^2}{\sum_{i=1}^{n}(o_i-\mu_o)^2} |
- Jensen–Shannon divergence (JSD; Lin, 1991) measures how different the distributions of the simulated and observed discharge are, regardless of their timing. Following Ficchì et al. (2026), it compares the histograms of the logarithm of the discharge, so it gives weight to low flows as well as to medium and high flows. It ranges from 0 to 1, with 0 as the ideal value (identical distributions). Values below 0.1 generally indicate an adequate representation of low flows (Ficchì et al., 2026).
- Joint Divergence Kling–Gupta efficiency (JDKGE; Ficchì et al., 2026) extends KGE′ with the JSD as a fourth, equally weighted component, adding a penalty for differences in the flow distribution. It ranges from −∞ to 1, with 1 as the ideal value.
| Mathinline |
|---|
JDKGE = 1 - \sqrt{(r - 1)^2 + (\beta - 1)^2 + (\gamma - 1)^2 + JSD^2} |
Stations with reservoirs off in the calibration and
on in the reanalysisAt 228 stations, the reservoirs upstream of the station were built after the period covered by the observations used for the calibration of the model. These stations are spread all over the globe: 61 in Asia, 47 in Africa, 39 in North America, 38 in South America, 24 in Europe, 11 in Central America and 8 in Oceania.
At these stations, the calibration and the reanalysis are set up differently:
on
.As a result, the reanalysis at these stations is partly compared with observations of a flow regime that no longer exists, and its scores can be lower than those of the calibration run. This is expected. It does not mean that the reanalysis, or the flood thresholds derived from it, are less reliable for present-day conditions.
To show the effect, both simulations are compared at each of the 228 stations against the same observations over the same period: the observations and the period used in the calibration. The differencein
skill is measured as ΔKGE = KGE′(reanalysis) − KGE′(calibration):the
same, which means the reservoirs have little effect at the station. At 45 stations, thereanalysis
scores lower, at 31 of them by more than 0.10. The median KGE′ is 0.70 for the calibration run and 0.64 for the reanalysis. Where the reservoirs have a large effect, the reanalysis typically shows damped flood peaks and higher low flows than the observations from before the reservoirs were built. This lowers the variability ratio γ and, as a result, KGE′.An interactive viewer shows each of these stations with its scores for both simulations and its hydrograph over the calibration period: https://dev.globalfloods.eu/reservoir-stations-viewer/.
The scores of these stations in the evaluation layer cover the full verification period, so they mix observations from before and after the reservoirs were built. They should be interpreted with the same care.
References
- Ficchì, A., Bavera, D., Grimaldi, S., Moschini, F., Pistocchi, A., Russo, C., Salamon, P. and Toreti, A. (2026). Improving low and high flow simulations at once: An enhanced metric for hydrological model calibration. *EGUsphere* [preprint]. https://doi.org/10.5194/egusphere-2026-43
- Gupta, H. V., Kling, H., Yilmaz, K. K. and Martinez, G. F. (2009). Decomposition of the mean squared error and NSE performance criteria: Implications for improving hydrological modelling. *Journal of Hydrology*, 377(1–2), 80–91. https://doi.org/10.1016/j.jhydrol.2009.08.003
- Kling, H., Fuchs, M. and Paulin, M. (2012). Runoff conditions in the upper Danube basin under an ensemble of climate change scenarios. *Journal of Hydrology*, 424–425, 264–277. https://doi.org/10.1016/j.jhydrol.2012.01.011
- Lin, J. (1991). Divergence measures based on the Shannon entropy. *IEEE Transactions on Information Theory*, 37(1), 145–151. https://doi.org/10.1109/18.61115
- Nash, J. E. and Sutcliffe, J. V. (1970). River flow forecasting through conceptual models part I — A discussion of principles. *Journal of Hydrology*, 10(3), 282–290. https://doi.org/10.1016/0022-1694(70)90255-6