Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Note

Documentation below is provided as is. The dataset the documentation below relates to is no longer supported and will be removed from the Climate Data Store (CDS) at a later date.

Page info
infoTypeModified date
prefixLast modified on
typeFlat

...

This document presents an overview of the status of the operational indicators for the C3S for Global
Shipping project and developments done in the last 3 months since delivery of
C3S_D422Lot1.OSM.2.6(2)_201808_Operational_Indicators_Technical_Note_v1 (Period 31 August - 01 November). This document describes the final phases of operational indicator definition and validation, while the definition and description of three new indicators has also been added.
The mean added resistance in the fuel consumption model has now been validated, and also the shaft power calculations of the full FCM have been validated against ship-log measurements. The detailed implementation and visualization plan for Route Cost ETA has been presented. A brief prototype workplan for calculation of the FCM with seasonal forecast data has been given.
Three new operational indicators of Route Cost Performance Speed, Route ETA Variation, and Arctic Sailing Cost have been defined in this document, and are ready for transition into the implementation phase of the service.

Appendices (Not available)

Appendix A – Route Cost ETA Product Definition Document (Implementation)

...