Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Expand
titleClick here to expand the list of related documents (D1-D8)

Anchor
rel_doc
rel_doc

Reference ID

Document

D1

GCOS implementation plan

D2

Merchant, C. J., Paul, F., Popp, T., Ablain, M., Bontemps, S., Defourny, P., Hollmann, R., Lavergne, T., Laeng, A., de Leeuw, G., Mittaz, J., Poulsen, C., Povey, A. C., Reuter, M., Sathyendranath, S., Sandven, S., Sofeiva, V. F. and Wagner, W. (2017) Uncertainty information in climate data records from Earth observation. Earth System Science Data, 9 (2). pp. 511-527. ISSN 1866-3516 doi: https://doi.org/10.5194/essd-9-511-2017

D3

Group for High Resolution Seas Surface Temperature Data Specification (GDS) v2, Casey and Donlon (eds.), 2012, https://www.ghrsst.org/wp-content/uploads/

2016

2021/

10

04/GDS20r5.pdf

Image Removed

D4

System Quality Assurance Document v2.0 (D1.LK.3-v2.0)

D5

Algorithm Theoretical Basis Document v2.0 (D1.LK.4-v2.0)

D6

Product Quality Assurance Document v2.0 (D2.LK.3-v2.0)

D7

Product Quality Assessment Report v2.0 (D2.LK.4-v2.0)

D8

Product User Guide and Specifications v2.0 (D3.LK.6-v2.0)


...

The STC update of the products is done using I-GDR-like (Interim Geophysical Data Records) data, while in case of complete reprocessing, GDR-like data are used instead. The data provided by the AVISO distribution centre (http://www.aviso.altimetry.fr/en/my-aviso.htmlImage Modified) are delivered daily for I-GDRs and once the cycle is complete for GDRs. The delivery time of these products is of the order of 2 days for the I-GDR. For potential reprocessing, only the GDRs will be used and there is, by definition, no delivery time consideration for these reprocessing.

...