...
Expand |
---|
title | Click here to expand the list of related documents (D1-D8) |
---|
|
Reference ID | Document | D1 | GCOS implementation plan | D2 | Merchant, C. J., Paul, F., Popp, T., Ablain, M., Bontemps, S., Defourny, P., Hollmann, R., Lavergne, T., Laeng, A., de Leeuw, G., Mittaz, J., Poulsen, C., Povey, A. C., Reuter, M., Sathyendranath, S., Sandven, S., Sofeiva, V. F. and Wagner, W. (2017) Uncertainty information in climate data records from Earth observation. Earth System Science Data, 9 (2). pp. 511-527. ISSN 1866-3516 doi: https://doi.org/10.5194/essd-9-511-2017 | D3 | Group for High Resolution Seas Surface Temperature Data Specification (GDS) v2, Casey and Donlon (eds.), 2012, https://www.ghrsst.org/wp-content/uploads/ 20162021/ 1004/GDS20r5.pdf Image Removed | D4 | System Quality Assurance Document v2.0 (D1.LK.3-v2.0) | D5 | Algorithm Theoretical Basis Document v2.0 (D1.LK.4-v2.0) | D6 | Product Quality Assurance Document v2.0 (D2.LK.3-v2.0) | D7 | Product Quality Assessment Report v2.0 (D2.LK.4-v2.0) | D8 | Product User Guide and Specifications v2.0 (D3.LK.6-v2.0) |
|
...
The STC update of the products is done using I-GDR-like (Interim Geophysical Data Records) data, while in case of complete reprocessing, GDR-like data are used instead. The data provided by the AVISO distribution centre (http://www.aviso.altimetry.fr/en/my-aviso.html
Image Modified) are delivered daily for I-GDRs and once the cycle is complete for GDRs. The delivery time of these products is of the order of 2 days for the I-GDR. For potential reprocessing, only the GDRs will be used and there is, by definition, no delivery time consideration for these reprocessing.
...