...
The information below might be incomplete depending on providers' information
ECCC
Info |
---|
icon | false |
---|
title | 08-07-2019 ECCC |
---|
|
The ECCC global ensemble prediction system (origin cwao in the TIGGE archive) was upgraded on July 3 2019. The main changes in this upgrade are: - The horizontal resolution of the Global Deterministic Prediction System (SGPD) is reduced from 25km to 15km, and the number of vertical levels is increased from 80 to 84 levels.
- The atmospheric component of the Global Ensemble Prediction System (GEPS) is now coupled with the ocean-ice model.
- The horizontal resolution of the Regional Ensemble Prediction System (REPS) increases from 15km to 10km, with an increase in the output frequency from 2 to 4 runs per day.
Full details of the changes made to the various systems are available in this official page.
|
Info |
---|
icon | false |
---|
title | 18-9-2018 ECCC |
---|
|
The ECCC global ensemble prediction system (origin cwao in the TIGGE archive) was upgraded to version 5.0.0 on 18 September 2018. The main changes in this upgrade are: - The 800x400 global Gaussian grid at 50 km resolution is updated to a Yin-Yang grid at 39 km resolution
- The model top is raised from 2 hPa to 0.1 hPa.
- In the ensemble Kalman filter assimilation component, the digital filter initialization is replaced by an incremental analysis update (IAU) procedure.
Further documentation of the operational upgrade can be found at http://collaboration.cmc.ec.gc.ca/cmc/cmoi/product_guide/docs/changes_e.html |
...