You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

This example represents a daily average valid on 2 January 2012 of a field produced by a re-forecast started on 20120101 00Z produced with the model version which is operational at 20130101 00Z. In this example, where the field is produced 6-hourly, the daily average valid on 20120102  is  the average of steps 24, 30, 36 and 42.

  • In bold, the values are fixed. They are meant to be used by all partners
  • In green, these are the values for the example.

 

Time ( daily average )
Start of re-forecast ( section 1 )

Octets

 

values

 Meaning of values
12Significance of Reference Time 1Start of forecast
13-14Year (four digits) 2012year of start of forecast
15Month 01month of start of forecast
16Day 01day of start of forecast
17Hour 00hour of start of forecast
Daily average ( section 4 )
18Indicator of unit of time range 1Hour
19-22Forecast time24Start of forecast + forecast time = start of average period
38-39Year of Model Version2013 when the forecast is run == when the version of the forecast used was operational
40Month of Model Version01when the forecast is run == when the version of the forecast used was operational
41Day of Model Version01when the forecast is run == when the version of the forecast used was operational
42Hour of Model Version00when the forecast is run == when the version of the forecast used was operational
43Minute of Model Version00when the forecast is run == when the version of the forecast used was operational
44Second of Model Version00when the forecast is run == when the version of the forecast used was operational
45-46year of end of overall time interval2012

 

End of average period

47month of end of overall time interval01
48day of end of overall time interval 03
49hour of end of overall time interval 00
52number of time ranges 1Only one time statistics applied (average)
53-56total number of data values missing in statistical process 0 
57

Statistical process used to calculate the processed field

from the field at each time increment during the time range

 0Average
58

Type of time increment between successive fields

used in the statistical processing

2

Successive times processed have

same start time of forecast, forecast time is incremented

59

Indicator of unit of time for time range

over which statistical processing is done

 116-hourly
60-63

Length of the time range over which statistical

processing is done, in units defined by the previous octet

 4Daily average
64

Indicator of unit of time for the increment between

the successive fields used

116-hourly
65-68

Time increment between successive fields,

in units defined by the previous octet

 1

Time frequency used to compute the daily mean

In the example, 1 means that  6-hourly outputs have been used to compute the average

  • No labels