You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Date

Attendees

Material

  • Two meetings of Gp last week provided material useful to co-design G3W-Figure-1
  • CO2 Paper 2022, CH4 Paper, N2O Paper 2023, NOx Paper 2023


G3W brochure for Cg-19 and COP28, respectively


Goals

  • G3W-IP Status of, Figures, and Linkages of G3W-RMS with WMO-RMS document

Discussion items

TimeItemWhoNotes
30min

G3W-IP Text

G3W IP draft_v17 Jan 2024

Oxana+Gp+Bin
  • Updated All-text-in document  
  • Turn yellow into paragaphs in Outlook
  • Integrate with high level input per chapter
  • Finance all together using file finances 
5min 

G3W-IP Figure 1

Gp+All
  • Based on COP28 brochure + CAMS GHGs ✅ 
5minG3W-IP Figure 2Bin+All
  • Check final titles (GHGs)
5minG3W-IP Table 1Oxana+Bin
  • Add Implementing Bodies Table
30minWMO-RMS G3W partsGp+All
  • Cross check with Daniel
30minG3W-Presentation to SGAll
5minG3W Next stepGp

G3W-Action-Plan Q1-2024

  • by the  the GP3-IP go to WMO-G3W-SG for internal review
  • by the  the GP3-IP go to open-community-review on WMO web 
  • two files as PDF one  specially formatted and on with Line number to facilitate the Peer-Review of the Document
  • a PDF of G3W-IP (final) without line number  by 
  • G3W-Team to proof-read the document by the  
  • All official documents need 6 language translation time is short
  • INFCOM-G3W presentation need to be ready by the  
  • INFCOM-3 https://wmo.int/events/constituent-body/infcom-3  


Action items

  • No labels