You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Time (Minimum over the last 6 hours )
Start of forecast ( section 1 )

Octets

reforecast

Octets

real time

 

Fixed values

to be used by

all the partners

 

Example

1212Significance of Reference Time=1Start of forecast= 1
13-1413-14Year (four digits) year of start of forecast= 2012
1515Month month of start of forecast= 01
1616Day day of start of forecast= 01
1717Hour hour of start of forecast= 00
Minimum ( section 4 )
1818Indicator of unit of time range= 1Hour= 1
19-2219-22Forecast time=Step at the beginning of the 6-hourly interval= 42
45-4638-39year of end of overall time interval 

 

End of minimum period

= 2012
4740month of end of overall time interval = 01
4841day of end of overall time interval = 03
4942hour of end of overall time interval = 00
5245number of time ranges= 1Only one time statistics applied (minimum)

= 1

53-5646-49total number of data values missing in statistical process= 0 = 0
5750

Statistical process used to calculate the processed field

from the field at each time increment during the time range

= 3Minimum= 3
5851

Type of time increment between successive fields

used in the statistical processing

= 2

Successive times processed have

same start time of forecast, forecast time is incremented

= 2
5952

Indicator of unit of time for time range

over which statistical processing is done

= 1Hour= 1
60-6353-56

Length of the time range over which statistical

processing is done, in units defined by the previous octet

= 66-hourly maximum= 6
6457

Indicator of unit of time for the increment between

the successive fields used

= 1Hour= 1
65-6858-61

Time increment between successive fields,

in units defined by the previous octet

= 0Minimum computed continuously in the 6 hourly interval= 0
  • No labels