...
ECMWF operational forecasts
At In 2012, at the time of this case study in 2012, ECMWF operational forecasts consisted of:
- HRES : spectral T1279 (16km grid) highest resolution 10 day deterministic forecast.
- ENS : spectral T639 (34km grid) resolution ensemble forecast (50 members) is run for days 1-10 of the forecast, T319 (70km) is run for days 11-15.
At the time of this workshop in In 2016, the ECMWF operational forecasts has been upgraded compared to 2012 and consisted of:
...
Code Block |
---|
convert -delay 75 -rotate "90<" in.ps out.gif |
Exercise 1.
...
Hurricane NadineECMWF analysis
Hurricane Nadine and the cut-off low
Panel | ||||||
---|---|---|---|---|---|---|
| ||||||
For these tasks, use the metview icons in the row labelled 'Analysis' an_1x1.mv : this plots horizontal maps of parameters from the ECMWF analyses overlaid on one plot. an_2x2.mv : this plots horizontal maps of parameters from the ECMWF analyses four plots to a page (two by two). an_xs.mv : this plots vertical cross-sections of parameters from the ECMWF analyses. |
...