This table shows the centres that provide data to this project together with the latest configuration of their systems. Follow the link of each Data Provider for specific model description.



 Status on
11 2019 
Time range
(forecasts and
hindcasts)
Resolution of model
Forecast initial
conditions
Forecast
ensemble size
Hindcast
initial conditions
Hindcasts
ensemble size
Hindcast period

Hindcast
production
schedule

ECMWF
(ecmf)
215 days

TCO319/L91

Dynamics:TCO319 cubic octahedral grid

Physics: O320 Gaussian grid (36 km)

91 levels in vertical, to 0.01hPa (80km)

 1st of month 51 members 1st of month251981-2016fixed
UKMO
(egrr)
215 days

N216/L85

0.83° x 0.56° (~ 60km in mid-latitudes)

85 levels in vertical, to 85km

 each day of month 2 members/day

1st, 9th, 17th, 25th

of month

7 members/start

time

1993-2016on-the-fly(1)
Météo-France
(lfpw)
215 days

TL359/L91 (0.5°)

91 levels in vertical, to 0.01hPa

last and penultimate Thursday of previous month

1st of month

25 members each

1 member

last and penultimate Thursday of previous month

1st of month

12 members each

1 member

1993-2016fixed
DWD
(edzw)
6 calendar months

 T127 T127 (~100 km) 

95 levels in vertical, to 0.1hPa01hPa

1st of month

50 members

1st of month30 members1993-20172019fixed
CMCC
(cmcc)
6 calendar months

approx  0.5° lat-long

46 levels in vertical, to 0.2hPa

1st of month50 members1st of month40 members1993-2016fixed

NCEP
(kwbc)

215 days

T128/L64 (~ 1°)

64 levels in vertical, to 0.02hPa

 each

each day of month

members initialised every 6 hours (at 0h, 6h, 12h and 18h UTC)

4 members/dayat 00, 06, 12 and 18

every 5 days (2)

members initialised every 6 hours (at 0h, 6h, 12h and 18h UTC)

4 members/start date

1993-2016fixed
JMA
(rjtd)
215 days

TL159 (approx. 110km)

60 levels in vertical, to 0.1hPa

every 5 days(3)13 members/day2 start dates lagged by 15 days (3)4 5 members/start date
at 00, 06, 12 and 18
1993-2016fixed


 NOTES

(1) For each real-time forecast start date, the associated hindcast data is produced and made available through the CDS at least one month in advance. The details about data availability can be found in "Summary of available data" page

(2) Details of the complete list of start dates are provided in the description of CFSv2 system, section 6. Other relevant information

(3) Details of the complete list of start dates are provided in the description of CPS2 system, section 6. Other relevant information