Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

(follow the model version links below for more details)

GEPS2103

  • ...to be added
  • The new JMA real-time ensemble system includes 2 start dates (Tuesdays and Wednesdays at 12Z) instead of the previous 4 runs (see the description in GEPS1701 below). The ensemble size is 25 members for both days and the resulting new lagged ensemble for S2S is a single 50-member ensemble starting on Wednesdays at 12Z.
  • operational from  

GEPS2003

  • two-tiered Sea Surface Temperature (SST) method is implemented in addition to improved physical parameterization schemes in the forecast model. In this approach, the oceanic lower-boundary condition is relaxed from the anomaly-fixed SST to the ensemble-mean SST based on prediction using the Seasonal Ensemble Prediction System (Seasonal EPS).

  • There is no change in the number of fields for real-time data but the number of reforecast ensemble members is  increased from 5 to 13, and the number of frequency is reduced from 3 to 2 per month.

  • operational from  

...