Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The plots below show the difference between HRES and ERA5 24-hour precipitation for 3 February at 1 & 3 days lead time


The plots below show the GPM IMERG satellite precipitation for 3 and 5 February (left), the HRES 24-hour precipitation at 1 day ahead (centre), and the difference between HRES and GPM IMERG 24-hour precipitation (right)

Image AddedImage AddedImage Added


Image AddedImage AddedImage Added

3.3 ENS

The plots below show the tropical cyclone track for the operational ECMWF forecasts from 5 February 00UTC (first plot) to 26 January 00UTC (last plot). The symbols shows the position on 5 February 00UTC. HRES (red), ENS CF (blue), ENS PF (grey) and BestTrack (black).

...