Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The main strategy to adopt is to avoid over-interpreting non-predictable features.  Therefore the detail of the most recent ensemble members should not be used in isolation.   Run-to-run jumpiness can on the one hand be tackled as something negative that has to be dampened, but on the other hand as something positive which can enrich the forecast information by giving alternative scenarios.  Ensemble members can give an indication of the probability and the consistency of features of the forecast.

Ensemble control member and HRES

Since introduction of Cy48r1 in June 2023, HRES and the ensemble control member have the same horizontal and vertical resolution.  However, there are some minor differences in the model structure.

...