Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Organization

Data acquisition method

Data transfer checkData delay checkData completeness checkData quality check

* Data packing


Data recovery option
Exists?Time limit?

BoM (ammc)

FTP






CMA (babj)

FTP






CNR-ISAC (isac)HTTP






CNRM (lfpw)

ECPDS (ECGATE)






CPTEC (sbsj)









ECCC (cwao)

SFTP






ECMWF (ecmf)

MARS retrievalN/AYESYESYES
YESNO

HMCR (rums)

FTPNOYESYESNO


IAP-CAS (anso)FTP






JMA (rjtd)HTTP






KMA (rksl)

ECPDS (push)YESNOYESNO
YESNO
NCEP (kwbc)FTPYESYESYESNO


UKMO (egrr)ECPDS (push)YESYESNONO
NO
  • Data acquisition  method: Acquisition method is pull (via ECPDS/FTP) from the provider's location to ECMWF's premises if not specified
  • Data transfer check: Is the data transfer checked to avoid any technical issues on the way from provider's location to ECMWF's premises? Was the data delivered bit identical?
  • Data delay check: Is the potential delay of  data availability checked on the provider's side?
  • Data completeness check: Is the data content (number of expected fields; reference field list etc) checked on the provider's side?
  • Data quality check: Is there any data quality control to avoid e.g. unrealistic parameter values due to interpolation or any other kind of error either scientific or technical?
  • Data packing: only if differs from the required  single packing

  • Data recovery option:  Is it possible to recover any missing/corrupted data when needed?
    • If yes, is there any time limit when the data can be rescued ? If yes, specify number of days within which the recovery action must happen.

...