Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

If data size is an issue only use MSLP & T2m for 00Z 15th - 18Z 19th, with all fields from 20th to 25th.

For Gibraltar case:  2012092700 (2618 for rainfall?)

HRES:

20120920 00Z, 5 days (to 20120925 00Z), 6hrly, native grid

Also 2012092700 as analysis for Gibraltar case.

Same fields as analysis (see below)

...

TL639L91. 20120920 00Z (single start date), 5 days (to 20120925 00Z), 6hrly (all members)

Also 2012092700 as analysis for Gibraltar case.

Same fields as analysis

Current operational ensemble (with NEMO on day 1) (expt id: gioi)

...

200, 500, 700, 850 hPa : Geopotential, temperature,  potential temperature, equivalent potential temperature, winds (U/V), relative humidity (rather than sp. hum.),

600hPa only vertical velocity (note: ENM suggested VV on 600hPa onlywaiting for confirmation want Pa/s or m/s)

850hPa only : absolute vorticity (not on any other levels)

...

Fields: Potential temperature, potential vorticity, winds (normal winds preferred), relative humidity, vertical velocity.

An & all forecasts & all ensemble members (if space). Review if necessary.

Note plotting should handle winds normal to x-section.

 

Observational data

  • if time and space only.

...