Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

de Rosnay P., I. Mallas and J. Hodkinson: NOAA NESDIS IMS snow cover date shift issue and acquisition change, ECMWF Research Memorandum RD16-110, 2016

Muñoz-Sabater J., P. de Rosnay, C. Albergel, L. Isaksen: SMOS Report on background and observation error scenarios, ESA /ESRIN contract 4000101703/10/NL/FF/fk, TNPII WP3401 & WP3402, 2016

Muñoz-Sabater J.,  N. Rodríguez-Fernández, P. Richaume, C. Albergel, P. de Rosnay: SMOS Near-Real-Time Soil Moisture processor: Operational chain and evaluation, ESA /ESRIN contract 4000101703/10/NL/FF/fk, Technical Report 2 (TR2) Work Package 4020, 2016

Rodríguez-Fernández N., P. Richaume, J. Muñoz-Sabater, P. de Rosnay, Y. Kerr: SMOS Near-Real-Time Soil Moisture processor. Recommended neural network conguration and algorithm description. ESA contract 4000101703/10/NL/FF/fk, SO-TN-CB-GS-0049, 2016

 

2015

de Rosnay P., Isaksen L., Dahoui M.: Snow data assimilation at ECMWF, ECMWF Newsletter no 143, article pp 26-31, Spring 2015 (pdf)

...