...
- 1 file per month of Analysis (1 type of level, all times, levels, and parameters), for example, have a look in the MARS Catalogue for for February 2015 model level analysis
- 1 file per Forecast (1 type of level, all steps, levels and parameters), for example, have a look in the MARS Catalogue for 1st February 2015 model level forecast at 12 UTC
- 1 file per Ensemble Forecast (1 type of level, all steps, members, levels and parameters), for example, have a look in the MARS Catalogue for 1st February 2015 pressure level 50 member ensemble at 12 UTC
...
Gliffy Diagram | ||||
---|---|---|---|---|
|
Post-processing
Any requested data manipulation or post-processing is carried out by the MARS client, except in the case of a local Member State's client where data is first processed at ECMWF prior to its transmission over the network. The post-processing is carried out by a set of routines present in the EMOSLIB library. Please, refer to the Field interpolation software routines for in-depth details about such post-processing.
...
By default spectral fields are automatically truncated before interpolation to grid fields to reduce data volumes and spurious aliased values. When automatic truncation is applied MARS issues a warning message like INTFB: Resolution automatically set to ....
The truncation can be controlled using the resol keyword. Default truncations are detailed in the following table.
...