Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

GEM Jan-2016

  • operational from

GEM Jan-2016

  • operational from

GEM Sep-2018

  • Yin-Yang grid
  • increased the horizontal  resolution from 50to 39 km and the vertical one from 40 to 45 levels
  • 20 years hindcast period changed from 1995-2014 to 1998 to 2017
  • operational from

...