Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

HRES output (10 days forecast period)

  • HRES output is shown to give "deterministic" snapshots of the forecast evolution for various combinations of parameters.  It is important not to be beguiled into treating HRES charts as definitive, despite the apparent detail.  The HRES should only be considered as one member of the medium range ensemble.
    Charts available:
    • Forecast charts (surface and upper air) - showing a selection of individual and combined parameters, to 10days forecast lead-time.
      • Charts available(atmospheric):
        • MSLP and wind speed at 850hPa
        • MSLP and wind at 200hPa
        • MSLP and Rain
        • MSLP and 500-1000hPa thickness
        • Vorticity and wind at 700hPa
        • Temperature and geopotential at various pressure levels
        • Wind and geopotential at various pressure levels
        • Wind and relative humidity at various pressure levels
        • Geopotential 500hPa and temperature at 850hPa
        • 2m temperature and 30m winds
        • 2m temperature and 10m winds
        • Total cloud cover
        • Indices (CAPE/K-index/Totalx)
      • Charts available(oceanic):
        • Significant wave height and mean direction
        • Mean wave period and direction
        • Total swell: Significant wave height and mean direction
        • Total swell: Mean wave period and direction
        • Significant wind wave height and mean direction
        • Mean wind wave period and direction
    • Imagery charts:
      • IR and WV imagery charts - these are derived from the structure of the IFS model atmosphere and provide a useful comparison with satellite imagery and analysed and forecast upper air flow patterns.  They may be particularly useful for seeing whether the model is replicating small scale features in the flow. (Example IR chart, Example WV chart). 

...

Long-range or Seasonal forecast charts are derived from an ensemble (separate from the extended range ensemble) run on the 1st of each month out to 7 months, extended to 13 months each quarter (i.e. every 3 months).   The charts available mostly cover 3-month periods, with the first valid period typically beginning 1 month after data time.
Charts available:

...

Provided alongside the forecasts are measures of the skill (Relative Operating Characteristics (ROC) and reliability that were "achieved" within the respective re-forecast periods.  Forecasters should always consider forecasts at these longer lead times in the context of these verification scores.  Using verification metrics to aid assessment of the predictability.  (Example ROC diagram, example reliability diagram).

...