Horizontal Navigation Bar |
---|
Button Group |
---|
Button Hyperlink |
---|
title | Previous |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Checking+the+results |
---|
|
Button Hyperlink |
---|
title | Up |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Tutorial |
---|
|
Button Hyperlink |
---|
title | Next |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Execute%2C+rerun+and+requeue |
---|
|
|
|
The following diagram shows the typical status changes for a Task.
Image AddedIn addition, the status of a
Once the program is up:
Select “Preferences” from the Edit “Servers” menu.
Next click on the Servers tab and "Manage Servers..." menu
"Add server" enter details of your ECF server.
You should also change the preferences to "Administrator" mode, which shows an enhanced set of menu options.
- In ecflow_ui: Select "Tools Menu:Preferences"
- Select Menus and change "menu mode" to "Administrator".
Choose a name for your ECF server and add the Host name and port number
...
you noted down earlier
...
. Make sure 'Add server to current view' is clicked on the dialog.
You should get something similar to the following display :
Image Removed
Image Added
The yellow boxes are called nodes. With the middle left mouse button click on the black triangle. This will expand the node. Repeat for node called 'test.'.
Info |
---|
S - stands for the suite, F stands for Family, and T - stands for Task |
Image Added
Now select the View menu and then "Add info panel". This panel can be re-arranged on the window.
Image Removed
For that click on the
node t1, then press on the script
icontab.
A window should open showingthe task script:
Image Added
Image Removed
To see the ECF job or the output simply click on the tabs.
If you want to see the output in a different window, click on the output icon, select the node t1, then with the right mouse button, select the "Output..." menu option.
If we want to rerun the suite, move the mouse pointer over test and click on the right mouse button.
A pop-up menu will appear. Choose requeue (If the menu does not offer a requeue option,
...
, and choose requeue.
You will notice that the
node‘s change colour.
The colours reflect the
status of the nodes.
Image Removed
We have seen that ecFlowview uses the three buttons of the mouse to perform different actions. The following figure show how the mouse buttons are used in ecFlowview: There can be a long delay between the job changing status and that change being reflected in the ecflow_ui window (set to 60s as default).
To update the current state more quickly in that window, click the refresh (or F5).
Image Added
We will now add a table view. This allows us to see additional attributes when a node is selected. From the View menu, select "Add table view"
Image Added
You will notice that selection in the tree view, selects the corresponding node in the table view.
Task nodes contain a flag that can reflect the reason for its being aborted, complete, or submitted.
Here the associated icons that can be displayed in ecflow_ui
Image Added
Image Removed
What to do
- Explore ecFlowview ecflow_ui menus and windows
- There can be a long delay(60s) between the job changing status and that change being reflected in the
...
- ecflow_ui window.
To update the current state more quickly in that window, click on the green icon(top left-hand side), on the toolbar. (or F5)
Horizontal Navigation Bar |
---|
Button Group |
---|
Button Hyperlink |
---|
title | Previous |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Checking+the+results |
---|
|
Button Hyperlink |
---|
title | Up |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Tutorial |
---|
|
Button Hyperlink |
---|
title | Next |
---|
type | standard |
---|
url | https://confluence.ecmwf.int/display/ECFLOW/Execute%2C+rerun+and+requeue |
---|
|
|
|
...