Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

In 2012, at the time of this case study, ECMWF operational forecasts consisted of:

  • HRES : spectral T1279 (18km 16km grid) highest resolution 10 day deterministic forecast.
  • ENS    : spectral T639 (36km 31km grid) resolution ensemble forecast (50 members) is run for days 1-10 of the forecast, T319 (70km) is run for days 11–15.

...

The ECMWF operational deterministic forecast is called HRES. At the time of this case study, the model ran with a spectral resolution of T1279, equivalent to 18km 16km grid spacing.

Only a single forecast is run at this resolution as the computational resources required are demanding. The ensemble forecasts are run at a lower resolution.

...

If your cluster definition file is called 'ens_oper_cluster.example.txt', then Edit cluster_to_anref.mv and set:

Code Block
languagebash
#ENS members (use ["all"] or a list of members like [1,2,3]
members_1=["cl.example.1"]
members_2=["cl.example.2"]

...