Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Find on this page technical specification of the required input data and processing for the WMO Lead Centre for Wave Forecast Verification (LC-WFV)

Parameters

  • Output frequency:  the model output steps should be between 1 and 12 hour

  • Output types:  forecasts and analysis

...