Find on this page technical specification of the required input data and processing for the WMO Lead Centre for Wave Forecast Verification project (LC-WFV)
Output frequency: the model output steps should be between 1 and 12 hour
Name | units | |
---|---|---|
Atmospheric forcing: | m/s | |
m/s | ||
Wave Fields: | m | |
s | ||
Mean zero-crossing wave period | s | |
degree true |
Follow the links for exact GRIB2 WMO compliant definitions.
All details about the required input files including sample data can be found in the page Encoding details
Contact Richard Mladek for any further details, sample data exchange etc.