Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Data exchange

The input fields should be split by the output data type, level type and eps number as per below. All steps  should be merged into the same file.

Naming convention

tigge_CCCC_YYYYMMDDHH_VVVV_TT_LL_NNN.grib2   ... for ensemble  forecasts

...

  • CCC: centre acronym  (e.g. kwbc for NCEP data)
  • YYYYMMDDHH: date * time stamp (e.g. 2019100100 for 0Z run on 2019-10-01)
  • VVVV: test/prod
  • TT: cf/pf/fc (output type i.e. control forecast/eps member/high resolution forecast)
  • LL: pl/sl/pt/pv (level type i.e. pressure/surface/pv level/pt level data)
  • NNN: eps number (cf=0000, eps1=1001,....)