Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Control and perturbed forecasts are identified in section 1 and 4. The following tables explains how to code them in GRIB2:

Section 1


ensemble forecastdeterministic forecast
Octets
perturbed (pf)control (cf)forecast * (fc)
21type of processed data4 3 2

(*) high-resolution forecast interpolated to ensemble resolution (new request from 2020 for TIGGE, phase III)


Example control
Ensemble (section 4, template 4.61)


ensemble forecastdeterministic forecast
Octets
Example perturbed (pf)control (cf)forecast * (fc)
8-9product definition template number

1/11* 

1/11*

0/8*
35type of ensemble forecast255 (missing) 31255 (missing) 
36perturbation number7<eps number>0
37number of forecasts in ensemble51<eps size>51<eps size>
  • statistically processed (typeOfStatisticalProcessing is set up)

...