Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

You will start by studying the evolution of the ECMWF analyses and forecasts for this event. You will then run your own OpenIFS forecast for a single ensemble member at lower resolutions and work in groups to study the OpenIFS ensemble forecasts.

 

Note
titleCaveat

In practise many cases are aggregated in order to evaluate the forecast behaviour of the ensemble. However, it is always useful to complement such assessments with case studies of extreme events, like the one in this exercise, to get a more complete picture of IFS performance and identify weaker aspects that need further exploration.

Info
titleSaving images

 To save images during these exercises for discussion later, you can use:

Panel
bgColorwhite

"Export" button in Metview's display window. This will also allow animations to be saved into postscript.

or

Code Block
languagebash
titleUse the following command to take a 'snapshot' of the screen:
ksnapshot
Note
titleCaveat

In practise many cases are aggregated in order to evaluate the forecast behaviour of the ensemble. However, it is always useful to complement such assessments with case studies of extreme events, like the one in this exercise, to get a more complete picture of IFS performance and identify weaker aspects that need further exploration.

 

...

Code Block
languagebash
titleUse the following command to take a 'snapshot' of the screen:
ksnapshot
Panel
bgColorwhite
titleBGColorlightblue
titleSt Jude wind-storm key highlights

The case study will look at one of several severe wind-storms that hit Europe in late 2013 (see handout of ECMWF article by Hewson et al, ECMWF Newsletter 139).

  • On the 28th October 2013 a small, severe wind-storm named St Jude in the UK, hit the UK & north-western Europe.
  • A total of 19 people were killed across Europe, 5 in the UK.
  • The return period of the event based on wind-gust observations show the 10yr return period was exceeded along the North Sea coast.

  • From the 23rd October, the ECMWF forecast predicted a greater than 70% probability of a severe wind event (greater than 60kt, 31m/s, at 1km) over southern England. A signal for the storm was evident from the 21st October.
  • On the 24th October, the UK MetOffice issued an amber alert for wind-speed across southern England placing the potential impact in the highest category.

  • The cyclone first appeared as a cold front wave, over the Atlantic, late on 25th October.
  • It deepened and moved rapidly east then northeast, with the storm centre reaching southern Sweden late afternoon on the 28th.
  • The most rapid deepening occurred between 06-12UTC on the 28th when the strongest wind gusts were observed.

...

ECMWF operational forecasts consist of:

  • HRES : T1279 (16km grid) highest resolution 10 day forecast
  • ENS :   Ensemble (50 members), T639 (34km grid) resolution is run for days 1-10 of the forecast, T319 (70km) is run for days 11-15.

 

Panel
bgColorwhite
titleBGColoryellow
titleTeams

 We suggest these exercises are best done by small groups working in teams.

Suggestions are made in the exercises for how each team can work on different data.

...

Panel
bgColorwhite
titleBGColorlightlightgrey
titleThe HIRES HRES forecast

The ECMWF operational forecast is called HRES. The model runs at a spectral resolution of T1279, equivalent to 16km grid spacing.

Only a single forecast is run at this resolution as the computational resources required are demanding. The ensemble forecasts are run at a lower resolution.

Before looking at the ensemble forecasts, first understand the performance of the HRES forecast.

...

Panel
bgColorwhite
titleBGColorlightlightgrey
titlePlot HRES forecast

 For this task, use the metview icons in the row labelled 'Oper forecast'Image Removed

Image Added

oper_rmse.mv            : this plots the root-mean-square-error growth curves for the operational HRES forecast for the different lead times.

oper_1x1.mv and oper_2x2.mv              works   : these work in a similar way to the an_2x2.mv icon same icons used in the previous task where parameters from a single lead time can be plotted.

oper_to_an_runs.mv   mv  : this plots the same parameter from the different forecasts for the same verifying time. Use this to understand how the forecasts differed, particularly for the later forecasts closer to the event.

oper_to_an_diff.mv     mv    : this plots a single parameter as a difference between the operational HIRES forecast and the ECMWF analysis. Use this to understand the forecast errors from the different lead times.

 

Parameters & map appearance. These macros have the same choice of parameters to plot and same choice of mapType, either the Atlantic sector or over Europe.

Use the metview macros to plot different days and compare to analysis and plot forecast differences.

...

Note
iconfalse
titleKey questions
  1. How does HIRES the HRES forecast compare to analysis and observations?
  2. Was it a good or bad forecast? Why?
  3. How does the forecast change with the different lead times?
Note
iconfalse
titleTeam: getting startedGetting started

Each team should look at the forecast from all 4 starting dates and each team member should see the RMSE curves.

Start by looking at the RMS error curves for the 4 different starting dates using MSLP (mean-sea-level pressure) and WGUST10 (wind gust at 10m) and the two geographical regions: use the oper_rmse.mv icon for this Each team should look at the forecast from all 4 starting dates.

As a team, discuss what plots & parameters to use to address the questions above given what you see in the error growth curves.

A starting point is to look at the difference between forecast and analysis to understand the error in the forecast, particularly the starting formation and final error.

Team members can look at particular dates and choose particular variables for team discussion.

...

 

Task 2 : Visualize the ensemble forecasts and ensemble spread

...