Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents

Note: HRES and Ensemble Control Forecast are scientifically, structurally and computationally identical.  With effect from Cy49r1, Ensemble Control Forecast output is equivalent to HRES output shown in the diagrams.   At the time of the diagrams, HRES had resolution of 9km and ensemble members had a resolution of 18km.

...

Fig8.1.13-1(right): ecCharts display of probability of lightning flash density (here >0.1 strikes/100km2/h average during the previous 6h).

Note: HRES and Ensemble Control Forecast are scientifically, structurally and computationally identical.  With effect from Cy49r1, Ensemble Control Forecast output is equivalent to HRES output shown in the diagrams.   At the time of the diagrams, HRES had resolution of 9km and ensemble members had a resolution of 18km.

...

Read more on a lightning parameterization scheme for the ECMWF Integrated Forecasting System.



(FUG Associated associated with Cy50r1)