In these exercises we will look at a case study of a severe storm using a forecast ensemble. During the course of the exercise, we will explore the scientific rationale for using ensembles, how they are constructed and how ensemble forecasts can be visualised. A key question is how uncertainty from the initial data and the model parametrizations impact the forecast.

You will start by studying the evolution of the ECMWF analyses and forecasts for this event. You will then run your own OpenIFS forecast for a single ensemble member at lower resolutions and work in group to study the OpenIFS ensemble forecasts.

 

Note
titleCaveat

In practise many cases are aggregated in order to evaluate the forecast behaviour of the ensemble. However, it is always useful to complement such assessments with case studies of extreme events, like the one in this exercise, to get a more complete picture of IFS performance and identify weaker aspects that need further exploration.

Column
width25%
Panel
titleTable of contents

Table of Contents
maxLevel1

Recap

ECMWF operational forecasts consist of:

...

 To save images during these exercises for discussion later, you can either use:

...

...

bgColorwhite

"Export" button in Metview's display window under the 'File' menu to save to PNG image format. This will also allow animations to be saved into postscript.

or

...

use the following command to take a 'snapshot' of the screen:

Code Block
languagebash
ksnapshot
Info
titlePrinting

If For hardcopy prints are desired please use the printer ('ps_classroom') at the rear of the classroom and only print if necessary. The printer name is 'ps_classroom'.

St Jude wind-storm highlights

...

Note
iconfalse
titleObjectives
  1. Examine the map of wind-gust observations in the handout.
    Note the observed area of strongest windgusts and their intensity.
  2. How does the analyses compare with the observations?
  3. Understand the storm development and behaviour from the ECMWF analyses.

Starting up metview

Before starting metview, you may need to type a command to copy the exercise files to your user account.

Code Block
titleType the following command in a terminal window
metview

...

Panel
bgColorwhite
titleBGColorwhite
titleMetview icons

For this task, use the metview icons in the row labelled 'Analysis'Image Removed

Image Added

an_1x1.mv : this will plot a selection of parameters overlaid on one plot.

an_2x2.mv : this will plot a selection of parameters four plots to a page (two by two).

Getting started

Image Added

Task 1: Mean-sea-level pressure & wind gust

 

Right-click the mouse button on the 'an_1x1.mv' icon and select the 'Visualise' menu item (see figure right)Image Removed

After a few seconds, this will generate a map showing two parameters: mean-sea-level pressure (MSLP) and 3hrly max wind-gust at 10m (wgust10).

Note that as only 6hrly wind gust data is available from the operational forecasts, we have supplemented the 3hrly fields using forecast data

Use the play button Image Removed In the plot window, use the play button in the animation controls Image Added to animate the map and follow the development and track of the storm.

...

Right-click the mouse button on the 'an_1x1.mv' icon and select the 'Edit' menu item (see figure right).

...

Change, mapType=0   to   mapType=1   then click the play button Image Removed Image Added at the top of the window (please ask if you are not sure).

...

Code Block
languagebash
titleAdd wind arrows to the plot:
#Define plot list (min 1 - max 4)
plot1=["mslpwgust10","wgust10mslp","wind10"]            # use square brackets when overlaying multiple parameters per plot

As above, click the play button and then animate the map that appears. You might also want to change the mapType back to 'mapType=1' to show the larger geographical area.

Discuss the storm development and behaviour with your colleagues & team members.

If you prefer to see multiple plots per page rather than overlay them, please use the an_2x2.mv macro.

Info

That completes the

Info

That completes the first exercise.

If time

  • Explore the storm development and passage using the other parameters available on other pressure levels.
  • More explanation of how to use the Metview macro icons to alter the fields plotted are shown below.

Additional plotting tips.

For If you prefer to see multiple plots per page rather than overlay them, please use the an_2x2.mv macro.

 

How to plot in various layouts

Icon 'an_1x1.mv' produces a single plot on the page.

icon the number of maps appearing in the plot layout can be 1, 2, 3 or 4.  This is true of all the icons labelled '2x2'.

Icon 'an_2x2.mv' can produce up to 4 plots per page.

 

Info
 How to change the parameters in the plot

For the 'an_1x1.mv' icon, the plot contents can be changed by editing the plot1 variable in the macro as shown in the above first exercise.

To alter the plotted field, right-click and choose 'Edit'.

It is possible to overlay multiple fields by putting them in square brackets like this:

Image Removed

You will find a list of available parameters in the macro.

After editing the macro text, you can optionally save using the 'File' menu and 'Save'.

Display the plot by clicking: Image Removed

Animate the plots in the display window by clicking Image Removed

 

Info

How to change the plot appearance

For the an_2x2.mv icon the number of maps appearing in the plot layout can be 1, 2, 3 or 4.  This is true of all the icons labelled '2x2'.

an_2x2.mv demonstrates how to plot a four-map layout in a similar fashion to the one-map layout. The only difference here is that you need to define four plots instead of one.

Right-click on the icon and select 'Edit'. Change the plot layout like this:

Image Removed

Note how some plots can be single parameters whilst others can be overlays of two (or more) fields.

Wind parameters can be shown either as arrows or as feather by adding '_f' to the variable name.

Two map types are available covering a different area.

Image Removed

With mapType=0, the map will cover a smaller geographical area centred on the UK.

With mapType=1, the map will cover most of the North Atlantic

Exercise 2: The operational HRES forecast

Recap

The ECMWF operational deterministic forecast is called HRES. The model runs at a spectral resolution of T1279, equivalent to 16km grid spacing.

Only a single forecast is run at this resolution as the computational resources required are demanding. The ensemble forecasts are run at a lower resolution.

Before looking at the ensemble forecasts, first understand the performance of the operational HRES forecast.

Available forecast dates

Data is provided for multiple forecasts starting from different dates, known as different lead times.

Available lead times for the St Judes storm are forecasts starting from these October 2013 dates: 24th, 25th, 26th and 27th.

Some tasks will use all the lead times, others require only one.

Questions

Panel
bgColorlightblue
  1. How does the HRES forecast compare to analysis and observations?
  2. Was it a good or bad forecast? Why?
  3. How does the forecast change with the different lead times?

Available plot types

Panel

Image Removed

For this exercise, you will use the metview icons in the row labelled 'Oper forecast' as shown above.

oper_rmse.mv                                   : this plots the root-mean-square-error growth curves for the operational HRES forecast for the different lead times.

oper_1x1.mv & oper_2x2.mv    : these work in a similar way to the same icons used in the previous task where parameters from a single lead time can be plotted.

oper_to_an_runs.mv                         : this plots the same parameter from the different forecasts for the same verifying time. Use this to understand how the forecasts differed, particularly for the later forecasts closer to the event.

oper_to_an_diff.mv                           : this plots a single parameter as a difference between the operational HRES forecast and the ECMWF analysis. Use this to understand the forecast errors from the different lead times.

 

Parameters & map appearance. These macros have the same choice of parameters to plot and same choice of mapType, either the Atlantic sector or over Europe.

 

Getting started

Task 1: Forecast error

Root-mean square error curves are often used to determine forecast error compared to the analysis.

In this task, all 4 forecast dates will be used.

Using the oper_rmse.mv icon, right-click, select 'Edit' and plot the RMSE curves for MSLP (mean-sea-level pressure) & wgust10 (10m wind gust).

Repeat for both geographical regions: mapType=0 and mapType=1.

Q. What do the RMSE curves show?
Q. How do they vary according to lead-time?

Task 2: Compare forecast to analysis

a) Use the oper_to_an_runs.mv icon (right-click -> Edit) and plot the MSLP and wind fields. This shows a comparison of each of the forecasts to the analysis.

b) Use the oper_to_an_diff.mv icon and plot the difference map between a forecast date and the analysis.

Choose only one model run (lead-time) to look at (discuss with your team colleagues). If you want to change the default date, edit the following line:

Code Block
titleChange model run (forecast lead time) in oper_to_an_diff.mv
#Model run
run=2013-10-24

Task 3: Team working

As a team, discuss the plots & parameters to address the questions above given what you see in the error growth curves and maps from task 2.

Look at the difference between forecast and analysis to understand the error in the forecast, particularly the starting formation and final error.

Team members can limit to a certain date and choose particular parameters for team discussion.

Remember to save (or print) plots of interest for later group discussion.

Exercise 3 : The operational ensemble forecasts

Recap

...

Ensemble exercise tasks

This exercise has more tasks than the previous ones.

Visualising ensemble forecasts can be done in various ways. During this exercise, in order to understand the errors and uncertainties in the forecast, we will use a number of visualisation techniques.

...

Questions

...

THIS NEEDS IMPROVING

...

Available plot types

Panel

Image Removed

For these exercises please use the Metview icons in the row labelled 'ENS'.

ens_rmse.mv : this is similar to the oper_rmse.mv in the previous exercise. It will plot the root-mean-square-error growth for the ensemble forecasts.

ens_to_an.mv : this will plot (a) the mean of the ensemble forecast, (b) the ensemble spread, (c) the HRES deterministic forecast and (d) the analysis for the same date.

stamp.mv : this plots all of the ensemble forecasts for a particular field and lead time. Each forecast is shown in a stamp sized map. Very useful for a quick visual inspection of each ensemble forecast.

stamp_diff.mv : similar to stamp.mv except that for each forecast it plots a difference map from the analysis. Very useful for quick visual inspection of the forecast differences of each ensemble forecast.

ens_to_an_runs_spag.mv : this plots a 'spaghetti map' for a given parameter for the ensemble forecasts compared to the analysis. Another way of visualizing ensemble spread.

 

Additional plots for further analysis:

Image Removed

ens_1x1.mv : this plots a single map of a single ensemble member, the mean or the spread.

pf_to_cf_diff.mv : this useful macro allows two individual ensemble forecasts to be compared to the control forecast. As well as plotting the forecasts from the members, it also shows a difference map for each.

Getting started

 

Panel
bgColorwhite
titleBGColorwhite
titleStorm track handout: ens_oper
borderStyledotted

Please refer to the handout showing the storm tracks labelled 'ens_oper' during this exercise. It is provided for reference and may assist interpreting the plots.

Each page shows 4 plots, one for each starting forecast lead time. The position of the symbols is the storm centre valid for 28th Oct 2013 at 12Z. The colour of the symbols is the central pressure.

The actual track of the storm from the analysis is show as the red curve with the position at 28th 12Z highlighted as the hour glass symbol. The control forecast for the ensemble is shown as the green curve and square symbol. The lines show the 12hr track of the storm; 6hrs either side of the symbol.

Note the propagation speed and direction of the storm tracks.  The plot also shows the centres of the barotropic low to the North.

Q. What can be deduced about the forecast from these plots?

Task 1: RMSE "plumes"

This is similar to task 1 in exercise 2, except now the RMSE curves for all the ensemble members from a particular forecast will be plotted. All 4 forecast dates are shown.

Using the ens_rmse.mv icon, right-click, select 'Edit' and plot the curves for 'mslp' and 'wgust10'. Note this is only for the European region. The option to plot over the larger geographical region is not available.

Q. What features can be noted from these plumes?
Q. How do these change with different forecast lead times?

Note there appear to be some forecasts that give a lower RMS error than the control forecast. Bear this in mind for the following tasks.

If time

  • Explore the plumes from other variables.
  • Do you see the same amount of spread in RMSE from other pressure levels higher in the atmosphere?

Task 2: Ensemble spread

In the previous task, we have seen that introducing uncertainty into the forecast by starting from different initial conditions and enabling the stochastic parameterizations in IFS can result in significant differences in the RMSE (for this particular case and geographical region).

The purpose of this task is to explore the difference in more detail and look in particular at the 'ensemble spread'.

Refer to the storm track plots in the handout in this exercise.

Use the ens_to_an.mv icon and plot the MSLP and wind fields. This will produce plots showing: the mean of  all the ensemble forecasts, the spread of the ensemble forecasts, the operational HRES deterministic forecast and the analysis.

Q. How does the mean of the ensemble forecasts compare to the HRES & analysis?
Q. Does the ensemble spread capture the error in the forecast?
Q. What other comments can you make about the ensemble spread?

If time:

  • change the 'run=' value to look at the mean and spread for other forecast lead times.
  • set the 'members=' option to change the number of members in the spread plots.
    e.g. try a "reduced" ensemble by only using the first 5 ensemble members: "members=[1,2,3,4,5]".

Task 3: Spaghetti plots - another way to visualise spread

A "spaghetti" plot is where a single contour of a parameter is plotted for all ensemble members. It is another way of visualizing the differences between the ensemble members and focussing on features.

Use the ens_to_an_runs_spag.mv icon. Plot and animate the MSLP field using the default value for the contour level. This will indicate the low pressure centre. Note that not all members may reach the low pressure set by the contour.

Note that this macro may animate slowly because of the computations required.

Experiment with changing the contour value and (if time) plotting other fields.

Task 4: Visualise ensemble members and difference

So far we have been looking at reducing the information in some way to visualise the ensemble.

To visualise all the ensemble members as normal maps, we can use stamp maps. These are small, stamp sized contour maps plotted for each ensemble member using a small set of contours.

There are two icons to use, stamp.mv and stamp_diff.mv. Plot the MSLP parameter for the ensemble.

Q. Using the stamp and stamp difference maps, study the ensemble. Identify which ensembles produce "better" forecasts.
Q. Can you see any distinctive patterns in the difference maps? Are the differences similar in some way?

If time:

An additional exercise is to find ensemble members that appear to produce a better forecast and look for where the initial forecast differences are significant.

Start by using a single lead time and examine the forecast on the 28th.

  • Select 'better' forecasts using the stamp plots and use ens_to_an.mv to modify the list of ensembles plots. Can you tell which area is more sensitive in the formation of the storm?
  • use the pf_to_cf_diff macro to take the difference between these perturbed ensemble member forecasts from the control to also look at this.

Task 5:  Cumulative distribution function at different locations

Recap

Cumulative distribution function (CDF)

The figures to the right illustrate the relationship between a normal distribution and its associated cumulative distribution function.The CDF is constructed from the area under the probability density function.

The CDF gives the probability that a value on the curve will be found to have a value less than or equal to the corresponding value on the x-axis. For example, in the figure right, the probability for values less than or equal to X=0 is 50%.

The shape of the CDF curve is related to the shape of the normal distribution. The width of the CDF curve is directly related to the value of the standard deviation of the probability distribution function. For our ensemble, the width is then related to the 'ensemble spread'.

For a forecast ensemble where all values were the same, the CDF would be a vertical straight line.

...

Image Removed

The probability distribution function of the normal distribution
or Gaussian distribution. The probabilities expressed as a
percentage for various widths of standard deviations (σ)
represent the area under the curve.
Figure from Wikipedia.

...

Image Removed

Cumulative distribution function for a normal
distribution with varying standard deviation (σ)

Figure from Wikipedia

 

Task 1: CDF for 3 locations

This exercise uses the cdf.mv icon. Right-click, select 'Edit' and then:

...

Q. What is the difference between the different stations and why? (refer to the ensemble spread maps to answer this)
Q. How does the CDF for Reading change with different forecast lead (run) dates?

 Forecasting an event using an ensemble : Work in teams for group discussion

Ensemble forecasts can be used to give probabilities to a forecast issued to the public.

...

titleForecast for the Queen
Her Majesty The Queen has invited Royals from all over Europe to a garden party at Windsor castle on 28th October 2013 (~20 miles west of London). Your team is responsible for the weather prediction and decision to have an outdoor party for this event. You have 3-4 days to plan for the event. You can use the data and macros provided to you to first derive probabilities of severe weather at this location (this doesn't need to be exact so use the information for Reading). 

...

ii) The price of ordering the marquees and outdoor catering for the event is £100,000. Chances of the marquees falling apart when winds > 20 mph = 20% probability ; winds > 40 mph = 40% ; winds > 60 mph = 80%. Now what would the probabilities of the marquees failing be, given this new information from the rental service and the weather prediction you made?
This is type of problem is often discussed in terms of risk, or the idea of the cost/loss ratio of a user. Here the loss (L) would be some financial value that would be at loss if the the bad weather forecast event happens and no precautionary actions had been taken. The costs (C) would be the financial value associated with precautionary actions in case the event happens. The ratio of the costs to the loss, often called C/L ratio, could then be used for decision making by users. If the costs are substantially smaller than the potential loss, then already a relatively small forecast probability for the event would indicate to take precautionary actions. Whereas for large C/L this is less, or not at all, the case.

demonstrates how to plot a four-map layout in a similar fashion to the one-map layout. The only difference here is that you need to define four plots instead of one.

Right-click on the icon and select 'Edit'. Change the plot layout like this:

Image Added

Note how some plots can be single parameters whilst others can be overlays of two (or more) fields.

Wind parameters can be shown either as arrows or as wind flags ('barbs') by adding 'f' to the end of variable name e.g. "wind10f".

Exercise 2: The operational HRES forecast

Recap

The ECMWF operational deterministic forecast is called HRES. The model runs at a spectral resolution of T1279, equivalent to 16km grid spacing.

Only a single forecast is run at this resolution as the computational resources required are demanding. The ensemble forecasts are run at a lower resolution.

Before looking at the ensemble forecasts, first understand the performance of the operational HRES forecast.

Available forecast dates

Data is provided for multiple forecasts starting from different dates, known as different lead times.

Available lead times for the St Judes storm are forecasts starting from these October 2013 dates: 24th, 25th, 26th and 27th, all at 00UTC.

Some tasks will use all the lead times, others require only one.

Questions

Panel
bgColorlightblue
  1. How does the HRES forecast compare to analysis and observations?
  2. Was it a good or bad forecast? Why?
  3. How does the forecast change with the different lead times?

Available plot types

Panel

Image Added

For this exercise, you will use the metview icons in the row labelled 'HRES forecast' as shown above.

hres_rmse.mv                                : this plots the root-mean-square-error growth curves for the operational HRES forecast for the different lead times.

hres_1x1.mv & hres_2x2.mv    : these work in a similar way to the same icons used in the previous task where parameters from a single lead time can be plotted.

hres_to_an_runs.mv                     : this plots the same parameter from the different forecasts for the same verifying time. Use this to understand how the forecasts differed, particularly for the later forecasts closer to the event.

hres_to_an_diff.mv                       : this plots a single parameter as a difference between the operational HRES forecast and the ECMWF analysis. Use this to understand the forecast errors from the different lead times.

 

Parameters & map appearance. These macros have the same choice of parameters to plot and same choice of mapType, either the Atlantic sector or over Europe.

 

Getting started

Task 1: Forecast error

In this task, we'll look at the difference between the forecast and the analysis by using "root-mean-square error" curves as a way of summarising the performance of the forecast. Root-mean square error curves are a standard measure to determine forecast error compared to the analysis and several of the exercises will use them.

In this task, all 4 forecast dates will be used.

Using the hres_rmse.mv icon, right-click, select 'Edit' and plot the RMSE curves for MSLP (mean-sea-level pressure). Repeat for the 10m wind-gust parameter wgust10.

Repeat for both geographical regions: mapType=0 and mapType=1.

Q. What do the RMSE curves show?
Q.
How do they vary according to lead-time?

Task 2: Compare forecast to analysis

a) Use the hres_to_an_runs.mv icon (right-click -> Edit) and plot the MSLP and wind fields. This shows a comparison of 3 of the 4 forecasts to the analysis (the macro can be edited to change the choice of forecasts).

b) Use the hres_to_an_diff.mv icon and plot the difference map between a forecast date and the analysis.

We suggest looking at only one forecast lead-time (run) but when working in teams, different members of the team could choose a different forecast.

If you want to change the default date, edit the following line:

Code Block
titleChange model run (forecast lead time) in hres_to_an_diff.mv
#Model run
run=2013-10-24

Task 3: Team working

As a team, discuss the plots & parameters to address the questions above given what you see in the error growth curves and maps from task 2.

Look at the difference between forecast and analysis to understand the error in the forecast, particularly the starting formation and final error.

Team members can limit to a certain date and choose particular parameters for team discussion.

Remember to save (or print) plots of interest for later group discussion.


Exercise 3 : The operational ensemble forecasts

Recap

  • ECMWF operational ensemble forecasts treat uncertainty in both the initial data and the model.
  • Initial analysis uncertainty: sampled by use of Singular Vectors (SV) and Ensemble Data Assimilation (EDA) methods. Singular Vectors are a way of representing the fastest growing modes in the initial state.
  • Model uncertainty: sampled by use of stochastic parametrizations In IFS this means Stochastically Perturbed Physical Tendencies (SPPT) and the spectral backscatter scheme (SKEB)
  • Ensemble mean : the average of all the ensemble members. Where the spread is high, small scale features can be smoothed out in the ensemble mean.
  • Ensemble spread : the standard deviation of the ensemble members and represents how different the members are from the ensemble mean.

Ensemble exercise tasks

This exercise has more tasks than the previous ones.

Visualising ensemble forecasts can be done in various ways. During this exercise, in order to understand the errors and uncertainties in the forecast, we will use a number of visualisation techniques.

Gliffy Diagram
nameensemble workflow

General questions

Panel
  1. How does the ensemble mean 10m wind fields and MSLP compare to the HRES forecast and analysis?
  2. Examine the initial diversity in the ensemble and how the ensemble spread and error growth develops.  What do the extreme forecasts look like?
  3. Are there any members that consistently provide a better forecast? Can you identify the members close to observations/analysis both from a qualitative and quantitative approach?

Available plot types

Panel

Image Added

For these exercises please use the Metview icons in the row labelled 'ENS'.

ens_rmse.mv : this is similar to the oper_rmse.mv in the previous exercise. It will plot the root-mean-square-error growth for the ensemble forecasts.

ens_to_an.mv : this will plot (a) the mean of the ensemble forecast, (b) the ensemble spread, (c) the HRES deterministic forecast and (d) the analysis for the same date.

ens_to_an_runs_spag.mv : this plots a 'spaghetti map' for a given parameter for the ensemble forecasts compared to the analysis. Another way of visualizing ensemble spread.

stamp.mv : this plots all of the ensemble forecasts for a particular field and lead time. Each forecast is shown in a stamp sized map. Very useful for a quick visual inspection of each ensemble forecast.

stamp_diff.mv : similar to stamp.mv except that for each forecast it plots a difference map from the analysis. Very useful for quick visual inspection of the forecast differences of each ensemble forecast.

 

Additional plots for further analysis:

Image Added

pf_to_cf_diff.mv : this useful macro allows two individual ensemble forecasts to be compared to the control forecast. As well as plotting the forecasts from the members, it also shows a difference map for each.

ens_to_an_diff.mv : this will plot the difference between an ensemble forecast member and the analysis for a given parameter.

Getting started

Panel
bgColorwhite
titleBGColorwhite
borderStyledotted
titleStorm track printed handout: ens_oper

Please refer to the handout showing the storm tracks labelled 'ens_oper' during this exercise. It is provided for reference and may assist interpreting the plots.

Each page shows 4 plots, one for each starting forecast lead time. The position of the symbols represents the centre of the storm valid 28th Oct 2013 12UTC. The colour of the symbols is the central pressure.

The actual track of the storm from the analysis is shown as the red curve with the position at 28th 12Z highlighted as the hour glass symbol. The HRES forecast for the ensemble is shown as the green curve and square symbol. The lines show the 12hr track of the storm; 6hrs either side of the symbol.

Note the propagation speed and direction of the storm tracks.  The plot also shows the centres of the barotropic low to the North.

Q. What can be deduced about the forecast from these plots?

Info

The plots in the handout can also be found in the 'pics' folder.

Task 1: RMSE "plumes"

This is similar to task 1 in exercise 2, except now the RMSE curves for all the ensemble members from a particular forecast will be plotted. All 4 forecast dates are shown.

Using the ens_rmse.mv icon, right-click, select 'Edit' and plot the curves for 'mslp' and 'wgust10'. Note this is only for the European region. The option to plot over the larger geographical region is not available.

Q. What features can be noted from these plumes?
Q. How do these change with different forecast lead times?

Note there appear to be some forecasts that give a lower RMS error than the control forecast. Bear this in mind for the following tasks.

If time

  • Explore the plumes from other variables.
  • Do you see the same amount of spread in RMSE from other pressure levels in the atmosphere?

Task 2: Ensemble spread

In the previous task, we have seen that introducing uncertainty into the forecast by starting from different initial conditions and enabling the stochastic parameterizations in IFS can result in significant differences in the RMSE (for this particular case and geographical region).

The purpose of this task is to explore the difference in more detail and look in particular at the 'ensemble spread'.

Refer to the storm track plots in the handout in this exercise.

Use the ens_to_an.mv icon and plot the MSLP and wind fields. This will produce plots showing: the mean of  all the ensemble forecasts, the spread of the ensemble forecasts, the operational HRES deterministic forecast and the analysis.

Q. How does the mean of the ensemble forecasts compare to the HRES & analysis?
Q. Does the ensemble spread capture the error in the forecast?
Q. What other comments can you make about the ensemble spread?

If time:

  • change the 'run=' value to look at the mean and spread for other forecast lead times.
  • set the 'members=' option to change the number of members in the spread plots.
    e.g. try a "reduced" ensemble by only using the first 5 ensemble members: "members=[1,2,3,4,5]".

Task 3: Spaghetti plots - another way to visualise spread

A "spaghetti" plot is where a single contour of a parameter is plotted for all ensemble members. It is another way of visualizing the differences between the ensemble members and focussing on features.

Use the ens_to_an_runs_spag.mv icon. Plot and animate the MSLP field using the default value for the contour level. This will indicate the low pressure centre. Note that not all members may reach the low pressure set by the contour.

Note that this macro may animate slowly because of the computations required.

Experiment with changing the contour value and (if time) plotting other fields.

Task 4: Visualise ensemble members and difference

So far we have been looking at reducing the information in some way to visualise the ensemble.

To visualise all the ensemble members as normal maps, we can use stamp maps. These are small, stamp sized contour maps plotted for each ensemble member using a small set of contours.

There are two icons to use, stamp.mv and stamp_diff.mv. Plot the MSLP parameter for the ensemble. Repeat for wind field.

Q. Using the stamp and stamp difference maps, study the ensemble. Identify which ensembles produce "better" forecasts.
Q. Can you see any distinctive patterns in the difference maps? Are the differences similar in some way?

If time:

Use the macros to see how the perturbations are evolving; use ens_to_an_diff.mv to compare individual members to the analyses.

Find ensemble members that appear to produce a better forecast and look to see how the initial development in these members differs. Start by using a single lead time and examine the forecast on the 28th.

  • Select 'better' forecasts using the stamp plots and use ens_to_an.mv to modify the list of ensembles plots. Can you tell which area is more sensitive in the formation of the storm?
  • use the pf_to_cf_diff macro to take the difference between these perturbed ensemble member forecasts from the control to also look at this.
Info

Use 'mapType=1' to see the larger geographical area (please note that due to data volume restrictions, this mapType only works for the MSLP parameter).

Task 5:  Cumulative distribution function at different locations

Recap

The probability distribution function of the normal distribution
or Gaussian distribution. The probabilities expressed as a
percentage for various widths of standard deviations (σ)
represent the area under the curve.

Image Added

Figure from Wikipedia.

Cumulative distribution function for a normal
distribution with varying standard deviation (σ)

Image Added

Figure from Wikipedia.

Cumulative distribution function (CDF)

The figures above illustrate the relationship between a normal distribution and its associated cumulative distribution function.The CDF is constructed from the area under the probability density function.

The CDF gives the probability that a value on the curve will be found to have a value less than or equal to the corresponding value on the x-axis. For example, in the figure, the probability for values less than or equal to X=0 is 50%.

The shape of the CDF curve is related to the shape of the normal distribution. The width of the CDF curve is directly related to the value of the standard deviation of the probability distribution function. For our ensemble, the width is then related to the 'ensemble spread'.

For a forecast ensemble where all values were the same, the CDF would be a vertical straight line.

Plot the CDF for 3 locations

Image Added

This exercise uses the cdf.mv icon. Right-click, select 'Edit' and then:

  • Plot the CDF of MSLP for the 3 locations listed in the macro.e.g. Reading, Amsterdam, Copenhagen. 
  • If time, change the forecast run date and compare the CDF for the different forecasts.

Q. What is the difference between the different stations and why? (refer to the ensemble spread maps to answer this)
Q. How does the CDF for Reading change with different forecast lead (run) dates?

 Forecasting an event using an ensemble : Work in teams for group discussion

Ensemble forecasts can be used to give probabilities to a forecast issued to the public.

Panel
titleForecast for the Queen
Her Majesty The Queen has invited Royals from all over Europe to a garden party at Windsor castle on 28th October 2013 (~20 miles west of London). Your team is responsible for the weather prediction and decision to have an outdoor party for this event. You have 3-4 days to plan for the event. You can use the data and macros provided to you to first derive probabilities of severe weather at this location (this doesn't need to be exact so use the information for Reading). 

i) What would your prediction for the probability of winds > 10m/s (~20 mph) ; > 25m/s (~45 mph) ; > 30m/s (~67 mph)?
ii) The price of ordering the marquees and outdoor catering for the event is £100,000. Chances of the marquees falling apart when winds > 10m/s = 20% probability ; winds > 20m/s = 40% ; winds > 30m/s = 80%. Now what would the probabilities of the marquees failing be, given this new information from the rental service and the weather prediction you made?

This type of problem is often discussed in terms of risk, or the idea of the cost/loss ratio of a user. Here the loss (L) would be some financial value that would be at loss if the bad weather forecast event happens and no precautionary actions had been taken. The costs (C) would be the financial value associated with precautionary actions in case the event happens. The ratio of the costs to the loss, often called C/L ratio, could then be used for decision making by users. If the costs are substantially smaller than the potential loss, then already a relatively small forecast probability for the event would indicate to take precautionary actions. Whereas for large C/L this is less, or not at all, the case.

 

Exercise 4. Exploring the role of uncertainty using OpenIFS forecasts

To further understand the impact of the different types of uncertainty (initial and model), some forecasts with OpenIFS have been made in which the uncertainty has been selectively disabled. These experiments use a 40 member ensemble and are at T319 resolution, lower than the operational ensemble.

As part of this exercise you may have run OpenIFS yourself in the class to generate another ensemble; one participant per ensemble member.

Recap

    • EDA is the  Ensemble Data Assimilation.
    • SV is the use of Singular Vectors to perturb the initial conditions.
    • SPPT is the stochastic physics parametrisation scheme.
    • SKEB is the stochastic backscatter scheme applied to the model dynamics.

Experiments available:

  • Experiment id: ens_both.  EDA+SV+SPPT+SKEB  : Includes initial data uncertainty (EDA, SV) and model uncertainty (SPPT, SKEB)
  • Experiment id: ens_initial.  EDA+SV only  : Includes only initial data uncertainty
  • Experiment id: ens_model. SPPT+SKEB only : Includes model uncertainty only
  • Experiment id: ens_oifs. SPPT+SKEB only, class ensemble  : this is the result of the previous task using the ensemble run by the class

These are at T319 with start dates: 24/25/26/27 Oct at 00UTC for a forecast length of 5 days with 3hrly output.

The aim of this exercise is to use the same visualisation and investigation as in the previous exercises to understand the impact the different types of uncertainty make on the forecast.

A key difference between this exercise and the previous one is that these forecasts have been run at a lower horizontal resolution. In the exercises below, it will be instructive to compare with the operational ensemble plots from the previous exercise.

Panel
bgColorwhite
titleBGColorwhite
titleTeam working

For this exercise, we suggest either each team focus on one of the above experiments and compare it with the operational ensemble. Or, each team member focus on one of the experiments and the team discuss and compare the experiments.

Panel
bgColorwhite
titleBGColorlightlightgrey
titleAvailable plot types

 The different macros available for this exercise are very similar to those in previous exercises.

Image Added

For this exercise, use the icons in the row labelled 'Experiments'. These work in a similar way to the previous exercises.

ens_exps_rmse.mv     : this will produce RMSE plumes for all the above experiments and the operational ensemble.

ens_exps_to_an.mv   : this produces 4 plots showing the ensemble spread from the OpenIFS experiments compared to the analysis.

ens_exps_to_an_spag.mv : this will produce spaghetti maps for a particular parameter contour value compared to the analysis.

ens_part_to_all.mv     : this allows the spread & mean of a subset of the ensemble members to be compared to the whole ensemble.

Note that the larger geographical area, mapType=1, will only work for MSLP due to data volume restrictions.

Info

For these tasks the Metview icons in the row labelled 'ENS' can also be used to plot the different experiments (e.g. stamp plots). Please see the comments in those macros for more details of how to select the different OpenIFS experiments.

Remember that you can make copies of the icons to keep your changes.

Task 1. RMSE plumes

Use the ens_exps_rmse.mv icon and plot the RMSE curves for the different OpenIFS experiments.

Q. Compare the spread from the different experiments.
Q. The OpenIFS experiments were at a lower horizontal resolution.  How does the RMSE spread compare between the 'ens_oper' and 'ens_both' experiments?

If time: change the 'run=' line to select a different forecast lead-time (run).

Task 2. Ensemble spread and spaghetti plots

Use the ens_exps_to_an.mv icon and plot the ensemble spread for the different OpenIFS experiments.

Also use the ens_exps_to_an_spag.mv icon to view the spaghetti plots for MSLP for the different OpenIFS experiments.

Q. What is the impact of reducing the resolution of the forecasts? (hint: compare the spaghetti plots of MSLP with those from the previous exercise).
Q. How does changing the representation of uncertainty affect the spread?
Q. Which of the experiments ens_initial and ens_model gives the better spread?
Q. Is it possible to determine whether initial uncertainty or model uncertainty is more or less important in the forecast error?

If time:

  • use the ens_part_to_all.mv icon to compare a subset of the ensemble members to that of the whole ensemble. Use the stamp_map.mv icon to determine a set of ensemble members you wish to consider (note that the stamp_map icons can be used with these OpenIFS experiments. See the comments in the files).

Task 3.  What initial perturbations are important

The objective of this task is to identify what areas of initial perturbation appeared to be important for an improved forecast in the ensemble.

Using the macros provided, find an ensemble member(s) that gave a consistently improved

 

Exercise 4. Exploring the role of uncertainty using OpenIFS forecasts

To further understand the impact of the different types of uncertainty (initial and model), some forecasts with OpenIFS have been made in which the uncertainty has been selectively disabled. These experiments use a 40 member ensemble and are at T319 resolution, lower than the operational ensemble.

Experiments available:

  • EDA+SV+SPPT+SKEB : Includes initial data (EDA, SV) and model uncertainty (SPPT, SKEB) (experiment id : ens_both)
  • EDA+SV only                 : Includes only initial data uncertainty (experiment id: ens_initial)
  • SPPT+SKEB only          : Includes model uncertainty only (experiment id: ens_model)
  • SPPT+SKEB only, class ensemble   : this is the result of the previous task using the ensemble run by the class (experiment id: oifs)

These are at T319 with start dates: 24/25/26/27 Oct 00Z for 5 days with 3hrly output.

The aim of this exercise is to use the same visualisation and investigation to understand the impact the different types of uncertainty make on the forecast.

Follow the same tasks as above.

Plots:

  • as above
  • 4 frame: fc-an, fc-fc, pert.fc, ctl-an? *(compare the fc-fc maps with fc-an maps - can we see the uncertainty in the difference?)
  • PV maps

Task 1.

Objective: Understand the impact of changing the ensemble uncertainty

Look at ensemble mean and spread for all 3 cases.

  • How does it vary?
  • Which gives the better spread?
  • How does the forecast change with reducing lead time?

Task 2.

Look at different ensemble sizes?

Task 3.

...

forecast and take the difference from the control. Step back to the beginning of the forecast and look to see where the difference originates from. 

...

Use the large geographical area for this task. It is only possible to use the MSLP parameter for this task as it is the only one provided for the ensemble.

Task 4. Non-linear development

Ensemble perturbations are applied in positive and negative pairs. For each perturbation computed, the initial fields are CNTL +/- PERT. (need a diagram here)This is done to centre the perturbations about the control forecast.

So, for each computed perturbation, two perturbed initial fields are created e.g. ensemble members 1 & 2 are a pair, where number 1 is a positive difference compared to the control and 2 is a negative difference.

  • Choose an odd & even ensemble member from one of the 3 OpenIFS forecasts (e.g. members 9 and 10). For different forecast steps, compute difference of each member from the control forecast and then subtract those differences.  (i.e. centre the differences about the control forecast).pair (use the stamp plots). Use the appropriate icon to compute the difference of the members from the ensemble control forecast.
  • Study the development of these differences using the MSLP and wind fields. If the error growth is linear the differences will be the same but of opposite sign. Non-linearity will result in different patterns in the difference maps.What is the result? Do you get zero? If not why not? Use Z200 & Z500? MSLP?
  • Repeat looking at one of the other forecasts. How does it vary between the different forecasts?

If time:

  • Plot PV at 330K. What are the differences between the forecast? Upper tropospheric differences played a role in the development of this shallow fast moving cyclone.

Final remarks

Further reading

For more information on the stochastic physics scheme in (Open)IFS, see the article:

...

We gratefully acknowledge the following for their contributions in preparing these exercises, in particular from ECMWF: Glenn Carver, Sandor Kertesz, Linus Magnusson, Martin Leutbecher, Iain Russell, Filip Vana, Erland Kallen. From University of Oxford: Aneesh Subramanian, Peter Dueben, Peter Watson, Hannah Christensen, Antje Weisheimer.

  

...

Excerpt Include
Credits
Credits
nopaneltrue