Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Info
iconfalse
title2018-06-01 The new version of the LAM-EPS run by DMI

The new version of the  LAM-EPS run by DMI was implemented.The first affected runs in TIGGE-LAM archive are on 2018-05-22. The major changes:

  • new ensemble system based on the convection permitting HARMONIE-AROME model

  • outputs up to +42h
  • 1 less parameter for TIGGE-LAM archive as the large scale precipitation does not exist any more in the the convection permitting system

  • 2 newly provided parameters for TIGGE-LAM archive CAPE and CIN


Info
iconfalse
title2018-05-15 COSMO-DE-EPS replaced by COSMO-D2-EPS

The new set-up of COSMO model ("COSMO-D2") replaces the former COSMO-DE.  Methods of EPS member generation has not changed. The major changes:

  • grid spacing reduced from 2.8 km to 2.2 km
  • number of vertical levels increased from 50 to 65 with higher resolution in the boundary layer
  • model domain enlarged, mainly to the west

The updated description is available here.

...