The purpose of this space is to keep users of ECMWF services informed about the move to the new data centre, update them any service disruptions or degradation this might cause and to highlight any action user might need to take.

General


HPCF (and ecgate)

The Atos system...


Who is affected?

Action to take

DHS move (MARS and ECFS)

The Data Handling System (DHS), providing the MARS and ECFS services, needs to be moved to Bologna before the new Atos HPCF will produce an increased archive load. The migration is shown in the transition plan where all events are relative to day D, when the access to MARS and ECFS in Reading will be switched off. The DHS move is expected to last up to 4 weeks. To minimise the impact of the move, essential data, necessary to continue operational and time-critical activities, has been identified and archived in a Temporary-DHS. Before the DHS move we will conduct a number of dry-runs, during which the access to the main DHS in Reading will be blocked, to verify that the Temporary-DHS contains all essential data necessary to continue all critical activities. Some of the dry-runs will last for 1-2 days. A final longer dry-run, lasting 5-7 days, is expected to happen 4 weeks before the move and will help to establish the exact date of day D.



Main service disruptions


DateDurationImpact
Dry-run 1TBATBATBA
Dry-run 2TBATBATBA
......

Final dry-runOctober 2021, TBC5-7 daysdegraded access to non-essential and non-valid data
DHS-MoveNovember 2021, TBC28 daysdegraded access to non-essential and non-valid data


Impact to MARS service

No impact

The following services/data are not expected to be impacted by the dry-runs and the DHS-move

  • Operational Forecast Production (EMOS, ERA5T, CAMS, …)
  • Access to recent operational data (verification time less than 1 month in the past)
  • Archiving/storing into MARS
  • MS Time-critical suites
  • Atos HPC Alpha/Beta testing

For any other services/data please see below.  

Access disabled

The following services/data will not be available during dry-runs and the DHS-move

  • WebAPI public
  • ADS/CDS external
  • TIGGE/S2S/RD
  • Historical data: OD, ERA5


Degraded service/data access

The following services/access to data will be degraded during dry-runs and the DHS-move

  • WebAPI registered (private)
  • MARS
  • ERA5 BX production


Impact to ECFS service

During services disruptions retrieval of any data which has not been identified as essential will be degraded or not be possible. Archiving into ECFS should not be affected.



Who is affected?

Action to take