You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Technical reports/notes that were produced as part of ESA contract work that are relevant to the L2B/C processing are provided for download here:

Technical Note numberTitleBrief descriptionDownload
TN15.1Inventory of Aeolus Target Assimilation SystemsA questionnaire was sent to NWP users to determine their preferences for Aeolus windsAE-TN-ECMWF-151-v2.0_20131123_Target_Assim_Systems.pdf
TN15.2Aeolus observational requirements and the measurement grouping algorithmThe updated L2Bp algorithm in response to user needsAE-TN-ECMWF-152-v2.0_20131121.pdf
TN15.3End-to-end testing of the continuous mode L2B processorAn assessment of the quality of L2B products derived from realistic simulations of AeolusAE-TN-ECMWF-153-v3.1_20140319_final.pdf
TN8.3Aeolus Level-2B processing of A2D airborne campaign dataThe results from processing airborne campaign data with the L2BpAE-TN-ECMWF-83-v1.6_20150318_final.pdf

TN17.3

Testing the behaviour of wind retrievals with new E2S simulation options 
TN17.1Assessment of Level-2B wind errors resulting from realistic simulation of ISR/IRC/AUX_RB calibration chainThis report assesses the L2B HLOS wind systematic errors resulting from error processes that occur during calibration.

  • No labels