Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This was also a case for the MISTRAL initiative (an EU project in which Italian partners and ECMWF have collaborated). In that project we have the "Italy flash flood use case", spearheaded by ECMWF, in which post-processing, of different types, is applied to the ECMWF ENSemble, and also a 2.2km Italy-centred limited area COSMO ensemble. The post-processed outputs are blended together, with lead-time-dependant weighting, to make the final product, which aims to give better probabilistic rainfall forecasts, in particular with a view to providing improved early warnings of flash flood risk (via the association with extreme short period rainfall). Users are encouraged to focus on the higher percentiles (or probabilities of exceeding high thresholds) in the MISTRAL products, to gauge the potential for localised extremes. However the plots below illustrate how the ensemble mean is handled in the raw model and post-processed output, with differences between the two (for a given system) indicating the nature of any bias-correction being applied on the model grid-scale.

ModelDT 12UTC 26thDT 00UTC 27thDT 12UTC 27thDT 00UTC 28th




























Model1.    Raw ECMWF ENSemble2.   Post-processed ENS (ecPoint)3.   Raw COSMO Ens4.   Post-Processed COSMO Ens5.   Difference: 1 minus 3
DT 12UTC 26th

Image Added

Image Added




DT 00UTC 27th

Image Added

Image Added

Image Added

Image Added

Image Added

DT 12UTC 27th

Image Added

Image Added




DT 00UTC 28th

Image Added

Image Added

Image Added

Image Added

Image Added