Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The plots above shows the accumulated precipitation in HRES between 3-6 September (72 hours).


3.3 ENS

Gallery
includeLabelprob_72_100
sortcomment
titleProb. >100 m in 72 hours

The plots above shows the probability for more than 100 mm during the 72-hour period (3-6 September) from forecasts with different initial times.


3.4 Monthly forecasts

The figure above shows the ensemble mean anomalies for the week 1-7 September from different monthly forecasts, including the analysis (top panel).

...