Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

3. Predictability

  

3.1 Data assimilation

The plots below shows three examples of ASCAT observations for Pam. In the first case (9 March 12z), we had a position error that led to a wrong attribution of direction for some vectors. The second case (11 March 00z) is an example of a good first guess and the third case (12 March 12z) has very strong winds from ASCAT that caused rejections.

 

Image AddedImage Added

 

 

 

Image AddedImage Added

 

 

 

Image AddedImage Added


 

3.2 HRES

The plots above shows the HRES forecast for 24-hour precipitation (06-06) from 6 Oct 00z (left) and 5 Oct 12z (right). As seen in the report from MeteoFrance, the band of very high precipitation rates are missing.

...