Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

 Status:Ongoing analysis Material  Status: Finalised Material from: Linus


 

Show If
spacePermissionINTRA

Discussed in the following Daily reports:

Content by Label
sorttitle
cqllabel = "case_0348_tc_hagibis"

...

The plots below show EFI and SOT for 24-hour precipitation on 12 October.


The plot below shows the evolution of forecast for the grid point with maximum 1-day precipitation valid  12 October for the 1x1 degree box outlined in the HRES plots above. The plot includes ensemble (blue box-and-whisker), HRES (red dot) and model climate (red box-and-whisker).

Image Added

3.4 Monthly forecasts

...