Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The plots below show the GPM IMERG 24-hour precipitation for 22 February (left), the HRES 24-hour precipitation at 1 day ahead (centre), and the difference between HRES and IMERG 24-hour precipitation (right), followed by the same for 3 days ahead

Image RemovedImage Added

Image RemovedImage Added

3.3 ENS

The plots below show the tropical cyclone track for the operational ECMWF forecasts from 22 February 00UTC (first plot) to 13 February 00UTC (last plot). The symbols shows the position on 22 February 12UTC. HRES (red), ENS CF (blue), ENS PF (grey) and BestTrack (black).

...