Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
typeflat

...

printablefalse

2023

Info
iconfalse
title0827-0306-2016 2023 ECMWF forecast system change

Update of ECMWF forecast system. A new New version of ECMWF IFS model (IFS cycle 41r248r1) was has been introduced at ECMWF since 6Z run on 2023-06-27

With IFS Cycle 48r1, the horizontal resolution of the  medium-range ensemble  (ENS) will increase from 18 to 9 km. This will bring the ENS to the same horizontal resolution as the high resolution forecast (HRES). The vertical resolution for both ENS and HRES will remain at 137 model levels and the ENS will continue to have 51 members. For TIGGE, the IFS data is interpolated to the same resolution O640 as up to now.

More details can be found in TIGGE model upgrades#ECMWF


Info
iconfalse
title20-01-2022 Fixed issues in KMA data

After the KMA model update on 1th of July 2022,the values of  Surface net solar radiation were wrong . Also there were some occasional unwanted zero values for some other parameters (2t, 2d, tcc, 10m u/v etc). The affected data has been fixed now.

Find more information in Issues with data.


2022

Info
iconfalse
title01-07-2022 KMA forecast system change

The KMA has changed their model used for TIGGE contribution fromUnified Model  to Korean Integrated Model ensemble (KIM), version 3.7, since the 1st  of   July 2022. Find more information in TIGGE Models.


Info
iconfalse
title30-06-2022 Meteo-France forecast system change

The last step in 18Z runs in Meteo-France contribution to TIGGE has been changed from +108 to +102 hours since    


Info
iconfalse
title04-05-2022 UKMO forecast system change

The Met Office Global model was upgraded to OS45 with effect from the 12Z cycle on 2022-05-04. Find more information in the Model upgrades page.


Info
iconfalse
title10-03-2022 TIGGE portal at CMA

The TIGGE portal at CMA should be available now again after a while in  http://tigge.cma.cn/   It should contain in principle  the same data as the TIGGE archive at ECMWF. Currently after some technical issues in the past, the data is still available only for more recent period which should be extended soon to contain more historical data too. 

2021

Info
iconfalse
title13-10-2021 ECMWF forecast system change

New version of ECMWF IFS model (cycle 47r3) has been introduced at ECMWF since 6Z run on 2021-10-12. 

Cycle upgrade 47r3 will bring improvements to the assimilation and observations usage and a significantly improved physical basis for moist processes, necessary to facilitate further development of the Integrated Forecasting System (IFS) and future application at convection-permitting resolutions.

More details can be found in TIGGE model upgrades#ECMWF


Info
iconfalse
title24-06-2021 Yearly stats added

Yearly statistics have been added to  TIGGE usage statistics .


Info
iconfalse
title14-06-2021 ECCC high resolution forecasts

The ECCC high resolution forecasts interpolated to the ensemble resolution have been added to TIGGE archive starting since the 11th June 2021 as per the details in the page Models.


Info
iconfalse
title14-05-2021 DWD forecasts back-archiving

The additional period of 9 months of DWD forecasts was back-archived in TIGGE so that it starts now on 1 March 2020. 


Info
iconfalse
title12-05-2021 ECMWF forecast system change

New version of ECMWF IFS model (cycle 47r2) has been introduced at ECMWF since 2021-05-11. In the IFS Cycle 47r2 single-precision for ENS (forecast up to day 46 and hindcast) and HRES (forecast) has been introduced. Moreover, the ENS vertical levels has been increased to 137 to bring it in line with HRES. 

This change will not affect the format of TIGGE products from IFS. 

More details can be found in TIGGE model upgrades#ECMWF


Info
iconfalse
title27-04-2021 JMA forecast system change

JMA global EPS has been upgraded to the version GEPS_2103 since   

The major changes are:

  • Increase of the number of vertical layers from 100 to 128
  • Increase of the number of ensemble members from 27 to 51
  • Revision of the global snow analysis
  • Introduction of the global soil moisture analysis

Further details can be found in the page  Models .  


Info
iconfalse
title15-04-2021 ECCC data resolution change

The horizontal resolution of t he ECCC contribution to TIGGE has been increased from 1.0 to 0.25 degree since 12Z  Also the GRIB 2 packing has been changed to simple instead of complex one (that will generally  increase file sizes but also significantly reduce time needed to process such data). All TIGGE data from all participating models should be encoded now using simple GRIB 2 packing.

Further details can be found in the page  Models .  


Info
iconfalse
title06-04-2021 Meteo-France forecast system change

Meteo-France global prediction system has been upgraded to the version PEARP5  since     The main technical changes related to TIGGE are:

  • 4 runs from 0/6/12/18Z instead of 2 from 6/18Z
    • there are different final steps for different runs:
      • 0/12Z: +48H
      • 6Z: +90H
      • 18Z: +108H
  • resolution increase to 0.5 degree
  • GRIB 2 simple packing instead of JPEG
  • tmin/tmax fix

Further details can be found in the page  Models .  

2020

Info
iconfalse
title17-12-2020 New model ICON from DWD added to TIGGE archive

The outputs from the global model ICON produced by Deutscher Wetterdienst (DWD) have been added to TIGGE archive starting from 12Z,  7 December 2020. In contrary to other ensemble systems, in ICON the control forecast is not produced (the ensemble consists of 40 perturbed members only). The high resolution forecast interpolated to the same resolution as the ensemble is also available for users.  Click   here   for more details.


Info
iconfalse
title26-11-2020 NCEP forecast system change

The NCEP global prediction system was upgraded to GEFS v12  since 12Z, 23 Sep 2020. The main technical changes related to TIGGE are:

  • increased ensemble size from 21 to 31
  • increased horizontal resolution from 1 to 0.5 degree

Find more information in the page Models.


Info
iconfalse
title10-11-2020 KMA high resolution forecasts

The KMA high resolution forecasts interpolated to the ensemble resolution have been added to TIGGE archive starting since the 5th November 2020 as per the details in the page Models.


Info
iconfalse
title22-10-2020 KMA forecast length extension

The forecast length of KMA outputs has been extended from 10 to 12 days starting since 21 October 2020 as per model details page.


Info
iconfalse
title13-07-2020 New model IMD GEFS added to TIGGE archive

New model outputs from the Global Ensemble Forecast System (GEFS) produced by India Meteorological Department (IMD) were added to TIGGE archive starting from 1 July 2020. Users can access the data on 0.12° x  0.12° grid (~12 km).  Click  here  for more details.


Info
iconfalse
title30-06-2020 ECMWF forecast system change

The ECMWF global prediction system  was upgraded to the version 47r1  since 30 June 2020. Find more information in the Model upgrades page.


Info
iconfalse
title11-06-2020 NCMRWF forecast system change

The NCMRWF global ensemble prediction system NEPS-G  (origin dems in the TIGGE archive) was upgraded to the version 3  since 11 June 2020. Find more information in the Model upgrades page.


Info
iconfalse
title01-06-2020 CMA forecast system change

The CMA global ensemble prediction system (origin babj in the TIGGE archive) was upgraded to the version GRAPES_GFS  since 1 June 2020. Find more information in the Model upgrades page.


Info
iconfalse
title04-05-2020 TIGGE ensemble forecast database for research continues to grow

TIGGE ensemble forecast database for research continues to grow - an article about TIGGE project update and also celebrating BoM resuming their contribution to the archive has been published. 


Info
iconfalse
title14-04-2020 BoM resuming their contribution to the archive

Bureau of Australia (BoM, TIGGE origin ammc) has resumed their  contribution to the archive after many years. Four runs per day are now available since the 1st of January 2020.  The data availability can be seen in TIGGE history page. Welcome back BoM! 

2019

Info
iconfalse
title13-12-2019 HW issue affecting some TIGGE data availability

We have experienced a hardware incident with a damaged tape volume (J0144200). Users trying to access data described below will get an error message until the problem is resolved.

Affected data:

  • type = pf
  • levtype = sfc
  • ranges: many dates across the whole TIGGE period

The expected data recovery is in 2-4 weeks in case of success. We apologise for any inconvenience.


Info
iconfalse
title04-12-2019 UKMO forecast system change

The UKMO global ensemble prediction system (origin egrr in the TIGGE archive) was upgraded to version PS43  for the 12UTC cycle on 4 December 2019. Find more information in the Model upgrades page.


Info
iconfalse
title01-04-2019 TIGGE user survey

The results of the 1 st  TIGGE user survey have been published . The total number of 383 users answered various questions about their experience with TIGGE products. 

2018

Info
iconfalse
title30-11-2018 ECMWF Tropical cyclone track data

The tropical cyclone track data from ECMWF model has been moved to a new location. Find more information in the page Tools. The new location is accessible also via a quick link in the top right section of the main ECMWF TIGGE page.


Info
iconfalse
title10-10-2018 TIGGE related workshop at ECMWF
There will be a major event related to TIGGE archive  at ECMWF,  2-5 April 2019: Workshop on Predictability, dynamics and applications research using the TIGGE and S2S ensembles. It is open now for registration and abstract submission.

Click here for more details.


Info
iconfalse
title18-9-2018 CMC forecast system change

The CMC global ensemble prediction system (origin cwao in the TIGGE archive) was upgraded to version 5.0.0 on 18 September 2018.

The main changes in this upgrade are:

  • The 800x400 global Gaussian grid at 50 km resolution is updated to a Yin-Yang grid at 39 km resolution
  •   The model top is raised from 2 hPa to 0.1 hPa.
  •  In the ensemble Kalman filter assimilation component, the digital filter initialization is replaced by an incremental analysis update (IAU) procedure. 

Click here for more details.


Info
iconfalse
title13-09-2018 HW issue affecting some TIGGE data availability

We have recently experienced a hardware incident with a tape volume becoming damaged. Users trying to access data described below will get an error message until the problem is resolved.

Affected data:

  • type = cf
  • levtype = pl
  • ranges: 2017/06/09 to 2017/06/10,   2017/08/03 to 2017/10/23  and 2018/01/24 to 2018/08/26

The expected data recovery is in 2-4 weeks in case of success. We apologise for any inconvenience.

As of the access to all previously unavailable data has been restored successfully.


Info
iconfalse
title24-07-2018 NCMRWF forecast system change

Update of NCMRWF forecast system. A new version of NCMRWF model was introduced. The first archived updated model runs are from the 1st of July. The main changes are:

  • reduced number of the ensemble size from 45  to 12
  • two model runs 00 and 12 UTC at very high resolution (0.12x0.18 degree)

Click here for more details.


Info
iconfalse
title18-06-2018 Usage statistics
A new page with TIGGE data usage statistics was added.

2017

Info
iconfalse
title20-12-2017 New model NCMRWF added to TIGGE archive
New model outputs  from National Centre for Medium Range Weather Forecasting (NCMRWF, India) were added to TIGGE archive. The first starting date available thanks to the back-archiving is the 1st of August 2017. Click here for more details.


Info
iconfalse
title11-07-2017 ECMWF forecast system change
Update of ECMWF forecast system. A new version of ECMWF model (IFS cycle 43r3) was introduced. Click here for more details.


Info
iconfalse
title11-07-2017 Met Office Tropical Cyclone CXML data
From the 12UTC forecast on 11th July 2017 the Met Office tropical cyclone CXML data come from the upgraded MOGREPS-G (UM PS39) forecasts. Note that each CXML dataset includes tracks from a lagged ensemble of 36 members, i.e. the current forecast and the forecast from 6 hours earlier. The CXML data are available via the NCAR archive at  http://rda.ucar.edu/datasets/ds330.3/ or see the TIGGE cyclone exchange page at http://www.cawcr.gov.au/research/cyclone-exchange/ for further information.


Info
iconfalse
title11-07-2017 Met Office forecast system change

Update of MetOffice forecast system. A new version of MetOffice model (UM PS39) was introduced. Click here for more details.


Info
iconfalse
title19-01-2017 JMA forecast system change
Update of JMA forecast system. A new version of JMA model was introduced. Click here for more details.

2016

Info
iconfalse
title22-11-2016 ECMWF forecast system change
Update of ECMWF forecast system. A new version of ECMWF model (IFS cycle 43r1) was introduced. Click here for more details.


Info
iconfalse
title08-11-2016 MetOffice forecast system change

Update of MetOffice forecast system. A new version of MetOffice model (UM PS38)  was introduced. Click here for more details.


Info
iconfalse
title29-06-2016 KMA ensemble system upgrade

Update of KMA forecast system. A new version of the KMA model (UM version 8.5) was introduced. The most noticeable change is the increase by 1 ensemble member, from 24 (23+control) to 25 (24+control).


Info
iconfalse
title08-03-2016 ECMWF forecast system change

Update of ECMWF forecast system. A new version of ECMWF model (IFS cycle 41r2) was introduced. Click here for more

The main consequences for ECMWF-TIGGE data are:
  • Introduction of a new form of the reduced Gaussian grid, the octahedralgrid, for HRES, ENS and ENS Extended;
  • Horizontal resolution of the HRES increased from TL1279 / N640 to TCO1279 / O1280, where subscript C stands for cubic and O for octahedral;
  • Horizontal resolution of the ENS increased from TL639 / N320 to TCO639 / O640 for ENS (Days 0 - 15) and from TL319 / N160 to TCO319 / O320  for ENS Extended (Days 16 - 46);
  • For the medium-range ENS there will no longer be a decrease of resolution at day 10: the ENS Days 11 - 15 will be run at the same TCO639 / O640 resolution as ENS Days 0 - 10;

Click  here for full details.

2015

Info
iconfalse
title15-12-2015 Issues with NCEP feed

Some problems occurred with the feed for NCEP data, which prevented their ingestion in the TIGGE database from December 2015 . The problems are under investigation and it will be notified once resumed.

...

Info
iconfalse
title23-03-2010 8th meeting of the THORPEX GIFS-TIGGE Working Group

The 8th meeting of the THORPEX GIFS-TIGGE Working Group was held at WMO Headquarters, Geneva, 22-24 February 2010

 20082008

Info
iconfalse
title01-02-2008 All Data Providers in production mode

After being processed in test mode, data from Brazilian Centro de Previsao Tempo e Estudos Climaticos (CPTEC) is ingested in the TIGGE database in production mode from 1st February 2008.

...