Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Organisation

Data acquisition method

*

Data transfer checkData delay check

Data completeness check

Data quality check
CMA (babj)

ftp

YES




CPTEC (sbsj)http



ECCC (cwao)sftp (ssh key)



ECMWF (ecmf)MARS retrievalN/AYESYESYES
JMA (rjtd)http (wget)



KMA (rksl)ecpds (push, dedicated line)



MF (lfpw)ecpds (push, dedicated line)



UKMO (egrr)ecpds (push, dedicated line)



NCEP (kwbc)

ftp





NCMRWF (dems)

ftp





  • Data acquisition acquisition method: Acquisition method is pull from the provider's location to ECMWF's premises if not specified
  • Data transfer check: Is  Is the data transfer checked to avoid any technical issues on the way from provider's location to ECMWFto ECMWF's premises? Was the data delivered bit identical?
  • Data delay check: Is the data availability  potential delay of  data availability checked on the on the provider's side?
  • Data completeness check: Is the data content (number of expected fields; reference field list etc) checked on the on the provider's side?
  • Data quality check: Is there any data quality control to avoid e.g. unrealistic parameter values due to interpolation or any other kind of error either scientific or technical?