You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Organisation

Data acquisition method *

Data transfer checkData delay check

Data completeness check

Data quality check
CMA (babj)

ftp

YES


CPTEC (sbsj)http



ECCC (cwao)sftp (ssh key)



ECMWF (ecmf)MARS retrieval



JMA (rjtd)http (wget)



KMA (rksl)ecpds (push, dedicated line)



MF (lfpw)ecpds (push, dedicated line)



UKMO (egrr)ecpds (push, dedicated line)



NCEP (kwbc)

ftp





NCMRWF (dems)

ftp





  • Data acquisition method: Acquisition method is pull from the provider's location to ECMWF's premises if not specified
  • Data transfer check: Is the data transfer checked to avoid any technical issues on the way from provider's location to ECMWF's premises?
  • Data delay check: Is the data availability  potential delay checked on the provider's side?
  • Data completeness check: Is the data content (number of expected fields; reference field list etc) checked on the provider's side?
  • Data quality check: Is there any data quality control to avoid e.g. unrealistic parameter values due to interpolation or any other kind of error either scientific or technical?

  • No labels