...
Info | ||||
---|---|---|---|---|
| ||||
The ECCC global ensemble prediction system was upgraded to version 2.0.2 on 17 August 2011. The main changes included in this upgrade are:
Further documentation of the operational upgrade can be found at http://collaboration.cmc.ec.gc.ca/cmc/CMOI/product_guide/docs/changes_e.html |
ECMWF
Info | ||||
---|---|---|---|---|
| ||||
The ECMWF forecast system IFS was upgraded to the version 47r3. Cycle upgrade 47r3 will bring improvements to the assimilation and observations usage and a significantly improved physical basis for moist processes, necessary to facilitate further development of the Integrated Forecasting System (IFS) and future application at convection-permitting resolutions. More details can be found in: |
Info | ||||
---|---|---|---|---|
| ||||
The ECMWF forecast system IFS was upgraded to the version 47r1. This cycle includes changes in the treatment of observations and improvements in the data assimilation and to the model. Quintic vertical interpolation in the semi-Lagrangian advection scheme has been introduced as well as the inclusion of a better surface albedo climatology making use of more data from the MODIS instrument. New Metrics of Tropical Cyclone (TC) “size” will supplement the existing forecasts of TC track and intensity. Full details can be found in Implementation of IFS Cycle 47r1 page. |
...