...
Info | ||
---|---|---|
| ||
The resolution of one-week ensemble prediction model of JMA was upgraded on 21 November 2007. Major changes are:
Notes:
|
KMA
Info | ||
---|---|---|
| ||
The KMA has changed their model used for TIGGE contribution from UM (Unified Model) ensemble to KIM (Korean Integrated Model) ensemble since the 1st of July 2022. KMA has been operating 2 ensemble models based on UM and KIM. The latter one, KIM, was developed during 9 year project from 2011 to 2019 and became an operational model in 2020. |
UKMO
Info | ||||
---|---|---|---|---|
| ||||
The Met Office Global model was upgraded to OS45 with effect from the 12UTC cycle on 5 May 2022.
|
...