How can I differentiate between 50r1 test data and my current operational data?
You can identify the test data by the version number:
IFS Cycle 50r1 test products are available as version 80 (file names include “*80” asexpver).
Operational files keep the file naming convention remains the same as for your operational data.
Expand
title
Will changes made in our test configuration be carried over into production?
You will only see the changes you made or requested if you have confirmed that your feeds are "Ready to Migrate". On the day of implementation, the esuite (TPREd) will then become the operational (PREd). This means all the data requirement changes that were done to test your 50r1 data requirements, will start to be delivered operationally. If you have not marked your feeds as 'Ready to migrate', we will update your operational requirements automatically.
Expand
title
Will test 50r1 data be pushed to me automatically?
If you're a Basic/Bronze user, the Data Support team can push a test batch of IFS Cycle 50r1 data to the host configuration.
If you're a Silver/Gold user, then you can either push the data to yourself or set the data to be delivered in 'NORMAL' mode. If you put the data in 'NORMAL' mode, the data will be disseminated to your host automatically. However, the data are disseminated between operational windows to protect network capacity, meaning the data will not be disseminated according to the usual dissemination schedule. There is no fixed delivery schedule, and products may not be available in real time, delays of up to one day are possible.
Note: 'NORMAL' mode will not be available until w/c 2nd March 2026.
Expand
title
When are IFS Cycle 50r1 test data products disseminated? What is the schedule?
If you put your data normal mode, the data will be disseminated between operational windows to protect network capacity. There is no fixed delivery schedule, and products may not be available in real time, delays of up to one or days are possible. Usually as we get close to implementation the delay gets smaller.
Expand
title
Is the password/access token for the xdiss the same for the diss system?
The same TOTP token should be used for the xdiss as for the diss system.
Expand
title
Can I use the test data operationally?
No, the test data are strictly for non-operational use. Test products are intended for internal testing and validation only and must not be used in operational services or shared on social media.
Expand
title
If I add more test data in the TPREd, will this affect my daily volume allowance?
In the test PREd (TPred), you will be able to test as much data as you want (even over your current Volume Band), however when it comes to operational day, if you have made changes that are over your current Volume Band, you will need to do an amendment to your current contract.
Expand
title
Can I test 50r1 data (using expver=0080) in my operational PREd?
Will the test data be sent to my operational host?
Not necessarily. The host configuration of the test system might not be in sync with the operational system. You also might want to receive the data files at a different endpoint. In case, you would like to make changes, please indicate this in the form: RCP 50r1 - Test System User Details or contact us via https://support.ecmwf.int
Expand
title
Can I receive the test data pre-schedule?
As a Silver, Gold, or MC/CS user, you can put your feeds in pre-scheduled mode. However, until implementation day, this will function the same as normal mode and you will not receive data pre-schedule. If you would like to start receiving data in pre-scheduled mode after implementation day, we recommend keeping your feeds in this setting. Once you toggle the “Ready to Migrate” button, the pre-scheduled mode will become active then.
Expand
title
Can I access the IFS Cycle 50r1 test data in MARS Archive to test?
IFS Cycle 50r1 beta test datais available from MARS with E-suite experiment version (expver) 0080 (MARS keywords EXPVER=0080, CLASS=OD). If you have access to MARS or if you have an agreement that gives you access to the archive, you can access these data. Archived test data produced before the start of the Release Candidate Phase (before 18Z run), should beused with cautionas it may contain errors that were subsequently fixed. The data should not be used for operational forecasting.
Expand
title
Will the IFS Ensemble Control forecast (ENS-cf) still be disseminated earlier than the rest of the ensembles?
Since the IFS ENS-cf data will be incorporated into the D* files (Set-i), this means the data will be disseminated earlier than the ENS-pf data. For further details, please refer to the Dissemination schedule.
Expand
title
How long are the test files kept on the test ECPDS?
We keep the test files on the test ECPDS for a period of 5 days. Increasing the lifetime of the files on the test ECPDS will not work, as the data are deleted from the HPC after 5 days.
Expand
title
Will the Ensemble Control forecast (ENS-cf) have pertubationNumber=0 and type=cf?
For IFS Cycle 50r1, Ensemble Control forecast (ENS-cf) will become oper-fc and will not have perturbationNumber=0. The plan is to change this in IFS Cycle 50r2, with the GRIB2 migration.
Expand
title
Will hindcast (re-forecast) data be published? If so, what time length will it cover and when will it be available?
Yes, we will provide re-forecast products to allow creation of a model climate for both medium-range and extended-range. This will be provided in the next few weeks and more information will follow when they are available.
Expand
title
Can I test the new 'ECMWF' file naming convention during the 50r1 test phase?
Yes, if you would like to switch to the new file naming convention, you can test it in the test PREd (TPREd) environment during the IFS Cycle 50r1 Release Candidate phase.
If you are already updating your scripts, it would be a good opportunity to switch to the 'ECMWF' file naming convention at the same time.
Expand
title
Are there changes for AIFS data?
Yes,AIFS will be upgraded on the same day as IFS Cycle 50r1.
AIFS Single, the deterministic model, will be upgraded from v1.1 to v2. Please refer to Implementation of AIFS Single v2 for details of the implementation of AIFS ENS v2.
AIFS ENS, the ensemble model, will be upgraded from v1 to v2. Please refer toImplementation of AIFS ENS v2 for details of the implementation of AIFS ENS v2.
AIFS test data will be available later under a different experiment version number. Please subscribe toforecast_changes-request@lists.ecmwf.intto receive notifications about updates, including when the test data will be available.
We can already confirm that AIFS enfo-cf data for AIFS will continue to be disseminated.
Also, there will be no dissemination schedule change for AIFS data.
Expand
title
What will happen on implementation day?
On implementation day, we start using 50r1 as the operational cycle for IFS. You will only see the changes you made or requested if you have confirmed that your feeds are "Ready to Migrate". On the day of implementation, the esuite (TPREd) will then become the operational (PREd). This means all the data requirement changes that were done to test your 50r1 data requirements, will start to be delivered operationally. If you have not marked your feeds as 'Ready to migrate', we will update your operational requirements automatically.