...
Info | ||||
---|---|---|---|---|
| ||||
The ECCC global ensemble prediction system was upgraded to version 2.0.2 on 17 August 2011. The main changes included in this upgrade are:
Further documentation of the operational upgrade can be found at http://collaboration.cmc.ec.gc.ca/cmc/CMOI/product_guide/docs/changes_e.html |
ECMWF
Always refer to the latest IFS documentation in https://www.ecmwf.int/en/publications/ifs-documentation |
Info | ||||
---|---|---|---|---|
| ||||
The ECMWF forecast system IFS was upgraded to the version 48r1. With IFS Cycle 48r1, the horizontal resolution of the medium-range ensemble (ENS) will increase from 18 to 9 km. This will bring the ENS to the same horizontal resolution as the high resolution forecast (HRES). The vertical resolution for both ENS and HRES will remain at 137 model levels and the ENS will continue to have 51 members. For TIGGE, the IFS data is interpolated to the same resolution O640 as up to now. More details can be found in Implementation of IFS Cycle 48r1 |
...