Status: Ongoing analysis Material from: Linus
Discussed in the following Daily reports:
http://intra.ecmwf.int/daily/d/dreport/2013/10/23/sc/
http://intra.ecmwf.int/daily/d/dreport/2013/10/24/sc/
http://intra.ecmwf.int/daily/d/dreport/2013/10/25/sc/
1. Impact
2. Description of the event
3. Predictability (including 40r1 E-suite evaluation)
3.1 HRES
3.2 ENS
3.3 Monthly forecasts
4. Experience from general performance/other cases
5. Good and bad aspects of the forecasts for the event